Browse
Search
Agenda - 03-18-2025; 8-i - Construction Contract Award for Piedmont Food Processing Center Heating, Ventilation, and Air Conditioning Replacement
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 03-18-2025 Business Meeting
>
Agenda - 03-18-2025; 8-i - Construction Contract Award for Piedmont Food Processing Center Heating, Ventilation, and Air Conditioning Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:38:43 AM
Creation date
3/13/2025 11:32:35 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-i
Document Relationships
Agenda for March 18, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 03-18-2025 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Duke Energy Rebate Program <br /> If Duke Energy is your utilities provider ask Brady how we can help you participate in Duke's Smart Saver program for <br /> Rebates and Incentives when replacing your HVAC equipment with high-efficiency equipment and lighting. If your <br /> company is eligible to participate, these rebates and incentives can be assigned to you, the owner, or to Brady to help <br /> offset the first cost of your project. You will see the benefits of the energy savings for many years. Brady will file the online <br /> application for any rebates or incentives that apply with the program on your behalf. <br /> 3D Point Cloud Scanning Instructional Video <br /> 3D Point Cloud Scanning is creating remarkable opportunities for retrofitting and mechanical documentation. This <br /> technology is used in the development of design prefabrication drawings for a customer and allows them to view a map of <br /> the final installation before the project even begins. Due to the extensive measurements created from the 3D Point Cloud <br /> Scanning, a majority of the work can be completed off-site, significantly shortening the installation duration on-site <br /> compared to conventional approaches. Brady is committed to staying at the forefront of innovation and will continue to <br /> implement tools like this to serve our customers more effectively. <br /> Check out our informational video: https://youtu.be/k2g4Gp ODAw <br /> Work Area <br /> Brady should have free and clear access to the work area. All work is to be continuous any project delays requiring Brady <br /> to leave and remobilize to the site could add additional cost to the project. <br /> All Brady personnel and subcontractors shall take all means necessary to ensure that all debris are disposed of, and the <br /> work area is kept clean to guard against fire and safety hazards as well as to provide a more efficient work area. <br /> Safety <br /> Brady provides multiple safety training opportunities for our Associates to increase knowledge and communicating <br /> experience concerning workplace health and safety, in order to build their competence in hazard recognition and control. <br /> On an ongoing basis, Brady conducts OSHA 10 hour course for all field associates and 30 hour course for all <br /> superintendents as well as conducting concentrated training on all specific safety topics related to our industry. <br /> Page 11 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.