Orange County NC Website
1 <br /> This proposal is subject to cancellation by Brady in the event any contract or purchase order <br /> related to this proposal contains a provision that requires Brady to comply with any guidance <br /> for contractor or subcontractor workplace locations published by the Safer Federal Workplace <br /> Task Force. <br /> This proposal is subject to cancellation by Brady in the event Brady is unable to perform due <br /> to inability to secure qualified subcontractors willing to comply with any guidance for <br /> contractor or subcontractor workplace locations published by the Safer Federal Workplace <br /> Task Force, or Brady's inability to comply with such guidance. <br /> Split System Scope Of Work <br /> Equipment Demolition, Installation and Specification <br /> Brady will recover refrigerant from equipment prior to removal per EPA guidelines, disconnect <br /> all power wiring, control wiring, duct work and refrigeration piping as needed for the complete <br /> removal and disposal of the existing system. <br /> Brady will include all labor, accessories, tools, equipment and materials required to execute the <br /> installation of a new Trane Mitsubishi Ductless split system. <br /> Equipment Details Below; <br /> • Product Data -Trane Mitsubishi Ductless Split System <br /> • Qty: 2 Tag(s): ODS/IDS-1, ODS/IDS-2 <br /> Single Zone Heat Pump Outdoor Unit <br /> Wind Baffle (Field Installed) <br /> Wired Remote Controller(Field Installed) <br /> Ceiling Cassette Indoor Unit <br /> Ceiling Cassette Panel (Field Installed) <br /> Condensate Pump (Field Installed) <br /> Pipe, Valves, Fittings <br /> Brady will furnish and install all pipe, valves, fittings and specialty items as needed for <br /> refrigeration piping. <br /> All refrigeration piping will be type"L" hard drawn copper tubing and wrought copper fittings. All <br /> piping will be cleaned, dehydrated, sealed and marked ACR. <br /> Copper to copper joints will be brazed with a copper-phosphorous brazing alloy containing a <br /> minimum of 15% silver. <br /> After completing piping work, Brady will perform a piping pressure test. Brady will use a <br /> Page 6 of 14 <br />