Orange County NC Website
1 <br /> Controls Wiring <br /> Brady to furnish and install a programmable thermostat and low voltage wiring. Brady will <br /> provide new Equipment with BACnet Cards. Controls integration in not included in this <br /> proposal (owner will contract directly with Siemens for Controls work). <br /> Start-Up <br /> A Brady factory-authorized technician will perform start-up and inspection of new packaged <br /> unit according to the manufacturers written instructions. See attachment. <br /> Clarifications <br /> All work is based on straight time hours: Monday through Thursday from 7:00 am to 5:30 <br /> pm. <br /> Brady requires that the equipment for this project go through a submittal and review process <br /> to verify equipment design and performance before the final order of equipment will be <br /> released. This is completed to ensure that the end result meets the owner's expectations. <br /> Brady will request that you assign a company representative to review and sign off on the <br /> equipment prior to order placement. <br /> When crane work is to be performed over an occupied area a crane lift plan will be provided <br /> by the crane company. The plan will be reviewed by Brady's onsite superintendent and your <br /> site appointed personal before any lifting begins. We will require the area surrounding the lift <br /> be cleared and barricaded during the work. Once all lifting has been completed all work may <br /> resume. <br /> The packaged unit selected and quoted for this proposal is based on like for alike change <br /> out and does not reflect a change in capacity or load calculation for the area this unit <br /> servers. <br /> Any code deficiencies related to the existing conditions not specifically identified to be <br /> addressed is not included in our scope. <br /> Unforeseen conditions related to the owner's equipment or building that adversely impact <br /> the cost of the project may result in additional changes. <br /> When changing packaged unit out with like size packaged unit, it is assumed the conduit, <br /> wire, disconnects, breakers, electrical panel and duct work are adequately sized to serve <br /> the proposed packaged unit, and are functional and installed per code. <br /> A structural engineer must approve additional loading of the roof resulting from the <br /> installation of new equipment. The owner will be required to provide structural drawings of <br /> the roof for evaluation. Cost related to the structural up grades and required modification are <br /> not included in our scope and pricing. <br /> The building heating and cooling load calculations are based on information provided by the <br /> owner. Discrepancies of information provided and actual conditions could result in equipment <br /> being sized incorrectly. Brady is not responsible for problems resulting from incorrect information <br /> provided by the owner. <br /> Page 5 of 14 <br />