Orange County NC Website
43 <br /> 1 Slide #16 <br /> FEMA Flood Plain ,!i <br /> Off-Site - <br /> A <br /> } i Regulatory Steams <br /> L `} l <br /> Stream Buffers <br /> I .( <br /> g i <br /> 2 <br /> 3 Scott Radway said the image on the right shoes the stream buffers required by the UDO. <br /> 4 He said design has adopted an additional 25 ft of protected zone to address the critical root zone <br /> 5 in the UDO as well. In the left side image, he said the FEMA flood plain is visible. <br /> 6 <br /> 7 Slide #17 <br /> 25%+SLOPES <br /> �f Topography <br /> S & Slopes <br /> --25°!°+SCOPES � 1` Vii. <br /> G - <br /> low - <br /> 0.85% <br /> . 11 : I I Slope <br /> Ge61 lr' / 1 - - <br /> Ir <br /> i 1 t, :+r{ Gee +r '__ _ nre <br /> i <br /> I r Slope <br /> 1 Ili =• F5h[ 1, I <br /> r <br /> :I i I ✓✓ / i Y/ i <br /> —1 AO i we '1 i Gee 1 <br /> i• <br /> X4'.1 <br /> li AC <br /> 0.85 Ac <br /> 3.85 Ac <br /> 8 <br /> 9 Scott Radway said the percentages on the slide above mean there will be limited <br /> 10 disturbance to the topography and slopes of the land because it is already well-suited for the type <br /> 11 of community being proposed particularly when considering ADA requirements. <br />