Orange County NC Website
27 <br /> 1 Slide #3 <br /> Project Background <br /> f �1 <br /> • Approximately 19.6 acres of town-owned property, J <br /> between railroad tracks and Gold Hill Way/Orange <br /> Grove Ext. <br /> • Primary use of site is for construction of train station, <br /> but remaining property will be available for the town <br /> for additional complementary development � ) <br /> Comprehensive Sustainability Plan goal is to set aside <br /> 1/3 of remaining site for affordable housing(about 5 dk� ,777 <br /> acres) <br /> iV <br /> 2 <br /> 3 Stephanie Trueblood said there are several current transportation projects in the vicinity <br /> 4 of the proposed train station. She listed the following projects: <br /> 5 • 1-85 widening <br /> 6 • Reworking of interchanges at 1-85 and old 86 <br /> 7 • South Churton Street multi-modal plan, including widening <br /> 8 • Possibility of connecting old 86 to new 86 via Valley Forge Road <br /> 9 • Hwy 70 multi-modal study <br /> 10 • Rail re-alignment project to straighten curves in rail line <br /> 11 <br /> 12 Slide #4 <br /> Project Background <br /> • Train Station development �f y �` <br /> plan covers approximately �4 , <br /> 4.7 acres <br /> • Station will be about 8,000 <br /> sqft and include town offices <br /> and meeting space <br /> 13 <br />