Browse
Search
OUTBoard Mar 17 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Mar 17 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 2:19:28 PM
Creation date
3/12/2025 2:18:42 PM
Metadata
Fields
Template:
BOCC
Date
3/17/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 3: Draft Burlington-Graham Metropolitan Planning Organization (BGMPO) Project List <br /> MPO/ Recommendation <br /> # RPO Project Description/Need <br /> Staff OUTBoard <br /> Description: Widen US-70 and improve intersections from Buckhorn Road (SR-1114)to Durham County with NCDOT standard street cross-section 4G (110' row, 17.5' median, <br /> BG MPO/ US-70 11'travel lanes, 5' bike lane, c&g, and sidewalk), add turn lanes and safety improvements at NC-86, St. Mary's Road (SR-1002), Efland Cedar Grove Road (SR-1004), Frazier <br /> 1 TWTPO Improvements" Road (SR-1310), Richmond Road (SR-1312), Brookhollow Road (SR-1324), Faucette Mill Road (SR-1328), Miller Road (SR-1555), Lawrence Road (SR-1561), Palmers Grove County priority <br /> Church Road (SR-1562), Pleasant Green Road (SR-1567), Orange High School Road (SR-1588), and N Scotswood Boulevard (SR-2300). <br /> 2 BG MPO Mattress Factory Description: Construct a new interchange at the existing grade-separated crossing of Mattress Factory Road and 1-85/1-40 County priority <br /> Road Interchange <br /> Mattress Factory Description: Extend Mattress Factory Road northward across East Washington Street and the NCRR/Norfolk Southern railroad right-of-way to intersect U.S. 70 and close the <br /> 3 BG MPO Road Extension to existing railroad crossover road connecting East Washington Street and U.S. 70 approximately 240 feet to the east of the intersection of Mattress Factory Road and East County priority <br /> U.S. 70 Washington Street. <br /> Buckhorn Road <br /> 4 BG MPO (SR 1114) Description: Widen Buckhorn Road from 1-40/1-85 to West Ten Road (SR1144)to multiple lanes with bicycle and pedestrian facilities with grade separation over railroad to US-70. County priority <br /> Widening" <br /> BG MPO/ Lebanon Road <br /> 5 TWTPO (SR-1306) Description: Intersection and safety improvements along Lebanon Road (SR-1306)from Mill Creek Road (SR-1345)to Efland-Cedar Grove Road (SR-1004) County priority <br /> Improvements" <br /> Notes: <br /> * STI Law§ 136-189.11.Transportation Investment Strategy Formula section (d).(3).c.—The Department shall not provide financial support for independent bicycle and pedestrian improvement projects. <br /> ** Sidewalk subject to NCDOT sidewalk cost share policy 40% Orange County for Is'5' of sidewalk, 100%Orange County for any additional sidewalk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.