Orange County NC Website
NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT <br /> TIP/WBS # Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> HO-0013 Chapel Hill from Franklin Street and Rosemary Street, and the 2/26/2026 FY28 $2,100,000 Project approved by BOT and assigned. Stephen Robinson <br /> 51177.1.1 streets in between from Merritt Mill Road to Henderson Street Municipal agreement executed. <br /> 51177.2.1 in downtown Chapel Hill. Install new mast arm and curb and <br /> 51177.2.2 <br /> 51177. .1 sidewalk improvements. <br /> C-5650 Construct sidewalk on one side of SR 1919 (Smith Level 4/9/2026 FY2028 $2,749,000 Carrboro approved to incorporate water line Town of <br /> Road/S. Greensboro St.) from Public Works Drive to the work into design. Env doc returned w Carrboro/Stephen <br /> northern end of Old Pittsboro Road in Carrboro comments on 12/10/21 . Document to be Robinson <br /> updated to include additional limits for <br /> resurfacing. NCDOT waiting on revised <br /> 1-3306AC 1-40 at NC 86 - Upgrade to superstreet from Northwood Drive 5/19/2026 FY2029 $10,970,000 Planning and design activities underway Radha Attaluri <br /> to Ramp C/D at 1-40 interchange <br /> BP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road) 9/17/2026 FY2029 $2,900,000 Planning and design activities underway Daniel Dagenhart <br /> ROW acquisisition complete. <br /> EB-5886B Construct sidewalk/MUP/bike lanes on Estes Drive from south 10/1/2026 FY2028 $3,968,000 Municipal agreement executed and project Town of Chapel <br /> of Norfolk Southern Railroad to NC 86 (MLK Jr. Blvd.) in development underway. Hill/Stephen Robinson <br /> Chapel Hill <br /> 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $9,500,000 Planning and design activities pending Trung Nguyen <br /> 45910.1 .1 (Buckhorn Road) to West of SR 1006 (Orange Grove Road) <br /> 45910.3.1 <br /> B-6037 Replace Bridge #49 over Norfolk Southern Railway on NC 86 4/20/2027 FY2031 $14,080,000 Planning and design activities underway. Brandon Green <br /> 25% Plans complete. <br /> BP7-R013 Replace Bridge #90 on SR 1940 (Damascus Church Road) 9/16/2027 FY2030 $2,220,000 Planning and design activities underway Daniel Dagenhart <br /> Plans at 25% <br /> EB-5880 Construct sidewalk on the north side of SR 1005 (Jones Ferry 9/30/2027 FY2029 $950,000 Municipal agreement needs to be requested Town of <br /> Road) from Davie Road to SR 1010 (West Main St.) in and executed to begin work. Carrboro/Stephen <br /> Carrboro Robinson <br /> Page 2 TWTPO Mar 2025 <br />