Browse
Search
OUTBoard Mar 17 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Mar 17 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 2:19:28 PM
Creation date
3/12/2025 2:18:42 PM
Metadata
Fields
Template:
BOCC
Date
3/17/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED IN TWTPO - UNDER DEVELOPMENT <br /> TIP/WBS # Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-6207T Portions of Twenty-One (21) Routes. Curve Warning Sign 9/20/2023 9/30/25 $200,000 Planning and design activities underway. Dawn McPherson <br /> 51112 Installation. Construction started. <br /> SS-6207A NC 54 Pedestrian improvements between SR 1902 (Manning 2/15/2024 6/1/2025 $171 ,000 Planning and design activities underway. Dawn McPherson <br /> 50337 Drive) and SR 1937 (Old Fayetteville Road) in Chapel Hill and Materials have arrived and work has begun. <br /> Carrboro. Improvements will include refuge islands, 4 of the 5 locations have been completed. <br /> crosswalks and pedestrian signals. Improvements to be <br /> completed by state forces. <br /> HS-2007J Install a new crosswalk with Rapid Rectangular Flashing 2/6/2025 9/30/2026 $530,000 Planning and deisgn activities underway Suzana Matta <br /> Beacons (RRFB), raised center island, pedestrian signage, and <br /> approximately 125 linear feet of sidewalk on NC 86 at Critz <br /> Drive in Chapel Hill <br /> BL-0044 NC 54 from Westbrook Drive in Carrboro to west of US 4/17/2025 12/31/2025 $1 ,311 ,000 Construction funding to be requested once Trung Nguyen <br /> 49998.1 .1 15/501/NC 86 (South Columbia Street) interchange in Chapel municipal agreements are executed. Chapel <br /> Hill. Construct sidewalk and install pedestrian signals, Hill MA executed, Carrboro MA has also <br /> crosswalks, and refuge islands at selected locations. been executed. Utility Relocations near <br /> completion. <br /> P-5701 B Construct Platform, Passenger Rail Station Building at Milepost 6/30/2025 FY2026 $7,200,000 PE funding scheduled 7/1/2020. Planning Matthew Simmons <br /> 46395.1 .1 41 .7 Norfolk Southern H-line in Hillsborough and deisgn activities underway <br /> 46395.3.3 <br /> HL-0045 Repair Bridge #241 on Exchange Park Lane over Eno River 7/31/2025 FY2028 $153,800 Agreement executed, Hillsborough to Town of <br /> from South Churton Street to Faribult Lane in Hillsborough prepare environmental documents and Hillsborough/Stephen <br /> plans. Review of final plans underway. Robinson <br /> HS-2007H SR 1009 (Old NC 86) at SR 1727 (Eubanks Road) near 8/7/2025 FY2027 $153,000 Planning and deisgn activities underway Trung Nguyen <br /> 49317.1 .9 Chapel Hill. Right Turn Lane Modifications. <br /> 49317.2.9 <br /> 49317.2.10 <br /> 49317.3.9 <br /> BR-0092 Replace Bridge #37 on NC 86 over New Hope Creek 8/19/2025 FY2028 $6,400,000 Planning and design activities underway Alexander Foster <br /> EB-5721 Upgrade existing off-road path and construct new section of 9/25/2025 FY2026 $2,700,000 Bids opened 7/17/23 - Bids rejected. Project Town of Chapel <br /> path of Bicycle Route #1 from Cleland Drive to Willow Drive in on Hold. Chapel Hill to seek additional Hill/Stephen Robinson <br /> Chapel Hill funding and relet at a future date. <br /> Page 1 TWTPO Mar 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.