Orange County NC Website
NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/28/25 FY2027 $48,000,000 Planning and design activities Brian Ketner <br /> 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery. <br /> 48689.2.1 <br /> 48689.3.1 <br /> SS-6207AH SR 2424(S. Maple Street)at W.Gilbreath Street in Mebane. TBD TBD $25,000 Planning and design activities Dawn McPherson <br /> 51471 Convert intersection to all way stop operation. underway <br /> SS-6207AI SR 1003(Lindley Mill Road)at SR 1005(Greensboro Chapel TBD TBD $25,000 Planning and design activities Dawn McPherson <br /> 51472 Hill Road),south of Saxapahaw.Convert intersection to all underway <br /> way stop traffic control.Change existing overhead flasher to <br /> all red displays. <br /> SS-6207AJ SR 1581 (Stony Creek Church Road)at SR 1587(Pagetown TBD TBD $25,000 Planning and design activities Dawn McPherson <br /> 51429 Road),north of Burlington.Convert intersection to all way stop underway <br /> control. <br /> SS-6207Y SR 1001 (Union Ridge Road)at SR 1002(Jeffries Cross TBD TBD $33,000 Planning and design activities Dawn McPherson <br /> 51342 Road),north of Burlington.Convert intersection to all way stop underway <br /> control. Revise existing overhead flasher to all red displays. <br /> Signal Inv#07-0002. <br /> U-6011 Intersection improvements at US 70(South Church Street) TBD TBD $4,900,000 Planning and design activities Chris Smitherman <br /> 47146.1.1 and SR 1158(Huffman Mill Rd)in Burlington underway-ROW Certified. Utilities <br /> 47146.2.1 underway. Bids rejected. Moved to <br /> 47146.3.1 central for re-let. <br /> BGMPO Jan 2025 <br /> Page 4 <br />