Browse
Search
OUTBoard Mar 17 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Mar 17 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 2:19:28 PM
Creation date
3/12/2025 2:18:42 PM
Metadata
Fields
Template:
BOCC
Date
3/17/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/28/25 FY2027 $48,000,000 Planning and design activities Brian Ketner <br /> 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery. <br /> 48689.2.1 <br /> 48689.3.1 <br /> BP7-R018 Replace Bridge#254 on SR 2104(Mandate Road) 10/7/32 FY2034 $700,000 Planning and design activities Daniel Dagenhart <br /> underway <br /> BP7-R019 Replace Bridge#103 on SR 2182(Perry Road) 10/21/32 FY2034 $700,000 Planning and design activities Daniel Dagenhart <br /> underway <br /> U-6114 Install traffic signal and add turn lanes at NC 62(Atamance 1/1/40 post years $900,000 Planning and design activities Brandon Green <br /> Road)at SR 1155(Hatchery Road)/Bonnie Lane intersection pending. (Funded for Prelim. <br /> in Burlington Engineering only) <br /> 1-6009 Interchange improvements at 1-40/1-85 and SR 1158(Huffman 1/1/40 post years $936,000 Planning and design activities Brandon Green <br /> 47962.1.1 Mill Road). Construct additional right turn lane on 1-40 WB pending. (Funded for Prelim. <br /> 47962.2.1 Ramp and improve operations at SR 1308(Garden Road) Engineering only) <br /> 47962.3.1 intersection in Burlington <br /> SS-6207AA NC 62 at SR 1002(Jeffries Cross Road),north of Green TBD TBD $25,000 Planning and design activities Dawn McPherson <br /> 51338 Level.Convert intersection to all way stop control. underway <br /> SS-6207AB SR 1500(Gibsonville Ossipee Road)at SR 1553(Midway TBD TBD $25,000 Planning and design activities Dawn McPherson <br /> 51339 Church Road/Guilford County Farm Road),southwest of underway <br /> Ossipee.Convert intersection to all way stop control. <br /> SS-6207AE SR 1003(Lindley Mill Road)at SR 2172(Moores Chapel TBD TBD $52,000 Planning and design activities Dawn McPherson <br /> 51426 Cemetery Road)near Graham.Convert intersection from two underway <br /> way stop to all-way stop with overhead flasher. <br /> SS-6207AG NC 87 at SR 2172(Moores Chapel Cemetery Road)near TBD TBD $49,000 Planning and design activities Dawn McPherson <br /> 51428 Graham.Convert intersection from two way stop to all-way underway <br /> stop with overhead flasher. <br /> BGMPO Jan 2025 <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.