Browse
Search
OUTBoard Mar 17 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Mar 17 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 2:19:28 PM
Creation date
3/12/2025 2:18:42 PM
Metadata
Fields
Template:
BOCC
Date
3/17/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 2/28/25 FY2027 $48,000,000 Planning and design activities Brian Ketner <br /> 48689.1.1 (Trollingwood-Hawfields Road)in Mebane underway.CMGC delivery. <br /> 48689.2.1 <br /> 48689.3.1 <br /> BR-0060 Replace Bridge#14 on NC 14 over Cane Creek 9/16/25 FY2026 $5,900,000 Planning and design activities David Stutts <br /> underway <br /> EB-5885 Construct sidewalk on US 70(N.Church St.)from Beaumont 9/25/25 FY 2027 $700,000 Municipal Agreement required to City of <br /> Avenue to SR 1716(Graham Hopedale Road) begin work Burlington/Stephen <br /> Robinson <br /> EB-5879 Construct sidewalk on US 70(N.Church St.)from SR 1716 9/25/25 FY2027 $930,000 Municipal Agreement required to City of <br /> (Graham Hopedale Road)to SR 1719(Sellars Mill Road) begin work Burlington/Stephen <br /> Robinson <br /> U-6131 Install dual left turn lanes in westbound direction at NC 54(W. 1/15/26 FY2028 $3,500,000 Planning and design activities Brandon Green <br /> Harden Street)at NC 49(Maple Ave.)in Burlington pending <br /> 48916 Shift NC 61 and NC 100 intersection in Gibsonville to improve 1/15/26 TBD $650,000 Planning and design activities Trung Nguyen <br /> turning radii for trucks underway -ROW underway <br /> 50547 NC 49 at Green Level Church Road/James Boswell Road- 4/16/26 FY2027 $650,000 Planning and design activities Trung Nguyen <br /> Realign Intersection underway.65%plans complete.CFI <br /> meeting held. <br /> U-6014 Widen SR 1716(Graham-Hopedale Rd)to multi-lanes with 8/18/26 FY2028 $19,100,000 Planning and design activities Suzana Matta <br /> 47159.1.1 Bicycle/Pedestrian accommodations from SR 1720(West underway, Includes EB-5882.ROW <br /> 47159.2.1 Hanover Rd)to Morningside Drive in Burlington Acquisition 90% <br /> 47159.3.1 <br /> EB-5988 Construct sidewalk on Lee Ave./W.Lebanon Ave.to SR 1454 12/10/26 FY2028 $310,000 Municipal Agreement required to Town of <br /> (W.Haggard Ave.)in Elon begin work Elon/Stephen <br /> Robinson <br /> BGMPO Jan 2025 <br /> Pagel <br />
The URL can be used to link to this page
Your browser does not support the video tag.