Browse
Search
2025-096-E-County Mgr-Solar Equity-Solar on St Joseph CME Church
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-096-E-County Mgr-Solar Equity-Solar on St Joseph CME Church
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 2:04:24 PM
Creation date
3/10/2025 2:03:59 PM
Metadata
Fields
Template:
Contract
Date
3/5/2025
Contract Starting Date
3/5/2025
Contract Ending Date
3/6/2025
Contract Document Type
Contract
Amount
$50,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rank Applicant <br />Name Project Name Project Summary Amount <br />Requested <br />Recomme <br />nded <br />Funding <br />level <br />Total <br />Score <br />(out <br />of 26) <br />1 <br />Trees for the <br />Triangle <br />Shade for Schools Planting of 260 native trees and <br />distribution of 2,600 seedlings across 13 <br />schools in Orange County, prioritizing <br />schools in rural, underserved areas $50,000 $50,000 22.1 <br />2 <br />Habitat for <br />Humanity <br />Rooftop Solar on <br />Habitat Homes <br />Rooftop solar on 14 newly constructed <br />Habitat Homes $100,000 $50,000 21.7 <br />3 <br />Empowerment Peach Apartments <br />Solar Project <br />Elecrical panel box and labor for solar <br />installation project $19,800 $19,800 20.9 <br />4 <br />Eno River <br />Association <br />Nature Based <br />Solutions at the <br />Confluence Natural <br />Area <br />Conversion of 14.2‐acre agricultural field to <br />Piedmont prairie and reforestation of an <br />8.6‐acre agricultural field. Includes <br />purchase of equipment such as a $45,000 <br />tractor. $67,600 $22,600 20.5 <br />5 <br />SolarEquity St. Joseph's CME <br />Church Solar <br />Project <br />23.4‐kW solar array on the roof of St. <br />Joseph's CME Church <br />$78,251 $50,000 19.1 <br />6 <br />Urban <br />Sustainability <br />Solutions <br />Orange County <br />Green <br />Infrastructure <br />Workforce <br />Development <br />Program <br />Installation of sustainable stormwater <br />management measures in historically <br />underserved communities utilizing public <br />HS teachers and students in a certified <br />green infrastructure training program to <br />implement these measures $71,000 $58,100 18.6 <br />7 <br />Red Hawk Farm Farm Renewable <br />Energy <br />Infrastructure <br />Hire consulting firm to provide engineering <br />and design services for a REAP grant to <br />install solar on farm; replace single phase <br />with 3‐phase power to enable solar <br />installation $100,000 $0 18.2 <br />8 <br />Town of Chapel <br />Hill <br />Extended Service <br />and Key Equipment <br />for E‐Bike Pilot <br />Program <br />E‐bike maintenance and management <br />services to offer free e‐bike pilot program <br />in Chapel Hill; funds will supplement <br />federal funding received for this program <br />to help it operate for an additional six <br />months $57,165 $0 18.1 <br />9 <br />Community <br />Home Trust <br />Electrify 5 CHT <br />homes with water <br />heaters and heat <br />pumps <br />Replacement of gas water heaters with <br />electric water heaters & gas <br />furnace/electric air conditioners with <br />electric heat pumps for 5 homes in <br />Community Home Trust inventory $110,000 $0 17.8 <br />10 <br />Endswell The First Carbon <br />Neutral Funeral <br />Home <br />Installation of a 40‐kW solar array <br />$15,000 $0 17.6 <br />11 <br />Town of <br />Carrboro <br />Sustainable <br />Transportation <br />Pilot <br />Purchase of e‐bikes, safety equipment, and <br />storage to allow Town employees to <br />replace most low‐cargo trips within two <br />miles of each town building and a portion <br />of trips beyond two miles $49,620 $0 17.5 <br />12 <br />Jubilee Healing <br />Farm <br />Cob Outdoor <br />Classroom and <br />Food Forest <br />Construction of cob outdoor classroom and <br />adjacent food forest <br />$34,625 $12,000 17.2 <br />13 <br />Eno River <br />Farmers’ <br />Market <br />Compost Monitor Compost monitor for Eno River Farmers' <br />Market <br />$4,800 $0 16.6 <br />6Docusign Envelope ID: 257985C7-FC41-4937-8E64-B610C38DBA58
The URL can be used to link to this page
Your browser does not support the video tag.