Browse
Search
2025-096-E-County Mgr-Solar Equity-Solar on St Joseph CME Church
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-096-E-County Mgr-Solar Equity-Solar on St Joseph CME Church
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 2:04:24 PM
Creation date
3/10/2025 2:03:59 PM
Metadata
Fields
Template:
Contract
Date
3/5/2025
Contract Starting Date
3/5/2025
Contract Ending Date
3/6/2025
Contract Document Type
Contract
Amount
$50,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Information <br /> *Please submit for each project if applying for funding for more than one project. <br /> 1. Project Name: St. Joseph's CME Church Solar Project <br /> 2. Please briefly describe the <br /> proposed project. (100-300 <br /> words) <br /> SolarEquity intends on installing a 23.4kW solar array on the roof of St. <br /> Joseph's CME Church. To complete this project, SolarEquity will <br /> contract NC Solar Now to replace a portion of the church’s roof before <br /> installing the solar project. This step will ensure that the roof will be <br /> viable for the duration of the panels’ 30-year lifetime. The installation <br /> of solar on top of the church will have two measurable impacts. First, <br /> the project will obviate the emission of 1.038 million pounds of carbon <br /> into the atmosphere over a 30-year period. Second, the project will <br /> reduce the church’s energy bills by $117 per month or $1,409 per year. <br /> The reduction in energy costs will have a direct impact on St. Joseph's <br /> CME Church’s congregation as the Church’s members are responsible <br /> for paying for the church’s energy needs. The church serves Chapel <br /> Hill’s Northside Neighborhood, a historically black neighborhood whose <br /> residents have been gradually displaced by student rentals and <br /> gentrification. Furthermore, the Northside Neighborhood has <br /> historically been a provider of lower cost housing, catering to those <br /> making 30-60% of the area’s median income. By installing solar on St. <br /> Joseph's CME Church, members will see a material reduction in energy <br /> costs, thereby mitigating their energy burden. <br /> 3. Please choose the best <br /> description for the type of <br /> project*: <br /> *The Background and Information <br /> document provides examples. <br /> Clean Energy Infrastructure - New <br /> Clean Energy Infrastructure - Repair <br /> Clean Energy Infrastructure - Replacement <br /> Communication/Education <br /> Nature Based Solutions <br /> Waste Reduction/Circular Economy <br /> Analysis/Plan <br /> Other (Please describe): <br /> 4. Please choose the primary <br /> climate change mitigation focus <br /> for this project (select all that <br /> apply): <br /> Energy Efficiency <br /> Renewable Energy <br /> Beneficial Electrification <br /> Carbon Sequestration <br /> Other (Please describe): <br /> Page 8 of 28 <br />Docusign Envelope ID: 257985C7-FC41-4937-8E64-B610C38DBA58
The URL can be used to link to this page
Your browser does not support the video tag.