Browse
Search
Agenda - 03-11-2025; 2 - Consultant Presentation on Draft Orange County Land Use Plan 2050
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 03-11-2025 Work Session
>
Agenda - 03-11-2025; 2 - Consultant Presentation on Draft Orange County Land Use Plan 2050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 12:08:14 PM
Creation date
3/6/2025 11:58:34 AM
Metadata
Fields
Template:
BOCC
Date
3/11/2025
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Agenda for March 11, 2025 Work Session
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 03-11-2025 Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
92 <br /> Regional and Local Growth Actions 46.Evaluate County zoning designations <br /> to support the guidance provided in the <br /> 45.Undertake efforts for a coordinated Conservation and Growth Framework. <br /> review of intergovernmental planning <br /> agreements with partner municipalities 47. Adjust the Flexible Subdivision <br /> on a ten-year cycle.This includes the standards to reflect the new Rural <br /> Central Orange Coordinated Area Land Conservation Neighborhood policy <br /> Use Plan;Joint Planning Land Use Plan; guidance including a way to manage or <br /> Water and Sewer Management, Planning, limit agritourism uses within required <br /> and Boundary Agreement(WASMPBA); open space set-aside areas and provide <br /> and any future intergovernmental support for neighborhood-scale <br /> planning agreements. During this nonresidential to be included within <br /> coordinated review,six topics may be these developments. <br /> considered,as displayed in the map below. 48.Evaluate the nonresidential <br /> development acreage limitation for Rural <br /> Activity Nodes,which was established <br /> when the extent of zoning a <br /> parcel for nonresidential use <br /> was significantly different <br /> ' from today.Consider <br /> Vol changing the provision to <br /> i encourage development <br /> #' <br /> Blackwood ; of these sites and reflect <br /> ' changed conditions. <br /> Orange County 49.Initiate a process to <br /> � ub <br /> r Coservatin <br /> Eanks, and review and update the <br /> ETI 2050 Orange County Land <br /> y Rural Buffer 0 <br /> �a <br /> Calvander Rural Conservation Use Plan every 10 years <br /> ! <br /> GH RE HINeighborhood to reflect new tannin <br /> L LL <br /> a ! Rural Residential planning <br /> c�RRBORO Low Density conditions and issues and <br /> 55 , Neighborhood <br /> Rural Activity Node ensure relevant policy <br /> Economic Development <br /> Areaguidance for the long-term. <br /> a 501 <br /> JPA <br /> A0 50.50.Review previously <br /> .00/CH/CA Joint Planning completed planning studies <br /> -•Area(Est.1986)0 and Small Area Plans for <br /> --- �_� <br /> -------- implementation status and <br /> Orange County-Chapel Hill-Carrboro Joint Planning Area Land Use sunsetting, if appropriate. <br /> Plan Topics of Future Coordination <br /> 0 Re-evaluation of Rural Buffer <br /> Q Concept of Municipal Transition Area expansion <br /> Q Utility Service Area boundaries and policies <br /> 0 Concept of a Mixed Uses Center around Blackwood Station <br /> 0 Concept of Rural Conservation Neighborhoods in Rural Buffer <br /> 0 Concept of Rural Activity Nodes in Rural Buffer <br /> Orange County-Chapel Hill-Carrboro Joint Planning Area Land Use Plan Topics of Future Coordination <br /> ORANGE COUNTY LAND USE PLAN 2050 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.