Orange County NC Website
<br /> <br />Terms and Conditions <br />Plans/Specifications-Electrical work requested by others not indicated on plans and/or <br />specifications shall not be part of this agreement <br />Underground Work-All trenching assumes reasonable digging conditions with no major <br />rock that would require extra equipment and material to excavate. In such cases, there <br />may be additional charges based on evaluation of the conditions. <br />Weather-Project schedule may be delayed due to weather. Contractor is not responsible <br />for delays in the schedule due to weather. <br />Change Orders-Deviation or alteration to the scope of this agreement, including plans or <br />specification, shall be executed on receipt of written orders <br />Code and Installation Practices-Material and equipment supplied by Electrical Contractor <br />shall be installed in accordance with the National Electrical Code and local electrical <br />building code, and standard electrical practices. Requirements that are not codified as of <br />the date of this proposal are excluded from this quotation. <br />Warranty-Warranty of electrical material and equipment supplied by Electrical Contractor <br />shall be for a period of one year from the date of final invoice. No warranty will be <br />provided for material and equipment supplied by others, and no warranty shall be <br />performed while invoice(s), including change order(s) are past due. <br />Waste-EV Revolution will dispose of waste generated from construction. <br />Payout Phases <br /> Project Complete (100%) $10,212.50 <br /> Terms: Net 30 <br /> <br />This proposal does not become legal and binding unless signed by both parties. <br /> <br />________________________________Title__________________________ Date______________ <br />Owner/Contractor <br /> <br />______________________________________________________________ Date_______________ <br />Joel Bulpitt, EV Revolution <br />Docusign Envelope ID: A23BFA03-5C9C-4287-9CC4-79B14E3F136D