Browse
Search
2025-045-E-AMS-MBP Carolina-Commissioning and Post Commissioning for Whitted Human Services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-045-E-AMS-MBP Carolina-Commissioning and Post Commissioning for Whitted Human Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2025 3:17:58 PM
Creation date
2/13/2025 3:17:45 PM
Metadata
Fields
Template:
Contract
Date
1/22/2025
Contract Starting Date
1/22/2025
Contract Ending Date
1/31/2025
Contract Document Type
Contract
Amount
$6,076.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Barnes <br /> October 23, 2023 <br />Page 3 of 7 <br /> <br /> <br />MBP <br />4700 Falls of Neuse Road, Suite 370 | Raleigh, North Carolina 27609 | 919-875-0124 - Local | www.mbpce.com <br /> <br />2. Update and finalize the Cx plan for the construction phase. <br />3. Conduct six periodic on-site Cx team meetings and/or site observations to verify the completion <br />of PFCs; review the progress and coordination of the installed equipment; observe field testing. <br />Document all site observations and Cx meetings and provide such documentation to include site <br />observation reports, construction phase issues logs, and meeting minutes to the Client. <br />4. Review up to 20 submittals for the MEP equipment and systems to be commissioned, <br />concurrently with the design team, for compliance with the OPR and provide comments to the <br />Client related to the following: <br />a. Coordination, bulletin, and shop drawings <br />b. Product data, equipment manuals, and training program <br />c. Equipment suppliers’ start-up procedures <br />d. Automatic temperature control (ATC) – sequence of operations <br />5. Witness Duct Air Leakage Testing (DALT) and hydrostatic pressure testing. Testing will be <br />conducted by the mechanical contractor. MBP anticipates three visits to witness contractor <br />testing. <br />6. Review the testing, adjusting, and balancing (TAB) report, concurrently with the design team, for <br />compliance with the construction documents and provide comments to the design team and <br />owner prior to acceptance with the Engineer of Record. <br />7. Conduct post-TAB verification at the completion of construction. The TAB verification visit is <br />anticipated to occur during three business day period on-site. The TAB verification site visit will <br />be conducted after the final TAB report has been submitted and approved by the design team. <br />MBP will develop a plan to verify a random sampling of the readings from our review of the TAB <br />report. Our TAB verification plan includes verification of systems at the sampling rates defined in <br />the “SYSTEMS TO BE COMMISSIONED” above under “SCOPE OF SERVICES”. <br />8. Prepare Functional Performance Testing (FPT) procedures and coordinate, document, and <br />witness the Contractor execute the FPT at the completion of the construction phase. It is not <br />contemplated, however, that any FPT will occur before the final TAB report has been submitted <br />and approved by the design team. MBP will develop a plan for FPT of the equipment according <br />to the sampling rates defined in Systems to be Commissioned above. MBP anticipates seven <br />days on-site to complete the FPT procedures. <br />9. Back-check FPT issues after the Contractor confirms that corrective measures have been <br />completed. MBP anticipates completing the back-check of FPTs during a single day on-site. <br />Occupancy and Operations Phase Services <br />After the completion of the construction phase services, MBP will: <br />1. Finalize the Cx services in a single comprehensive record consisting of the following: <br />a. Executive summary report <br />b. Listing of non-compliance items with recommendations for correction <br />Docusign Envelope ID: 7CA4BC4F-3EF8-44C1-B1B9-12DF26878683
The URL can be used to link to this page
Your browser does not support the video tag.