Orange County NC Website
Ms. Barnes <br /> October 23, 2023 <br />Page 2 of 7 <br /> <br /> <br />MBP <br />4700 Falls of Neuse Road, Suite 370 | Raleigh, North Carolina 27609 | 919-875-0124 - Local | www.mbpce.com <br /> <br />2. Additional Option 1: Pre-Functional Checklists <br /> <br />SYSTEMS TO BE COMMISSIONED (Including sampling rates, minimum sample size of three) <br />Our proposal is based on the following estimated MEP equipment, systems and quantities: <br />1. Mechanical systems (HVAC) <br />a. Air Handling Unit (AHU) (Sample 3 of 3) <br />b. Boilers (Sample 2 of 2) <br />c. Chiller (Sample 1 of 1) <br />d. Primary pumps (Sample 3 of 3) <br />e. Secondary pumps (Sample 2 of 2) <br />f. Ductless Split Systems (DSS) (Sample 1 of 3) <br />g. Variable air volume (VAV) terminal units (Sample 43 of 169) <br />h. Direct Digital Control (DDC) System – HVAC controls (limited to sampling rates listed above) <br />As the Commissioning Authority (CxA), MBP will organize and lead the Cx team for systems being <br />commissioned during the design, construction, and occupancy phases for the Project as follows: <br />BASE SERVICES: <br />Design Phase Services <br />MBP will: <br />1. Develop the Cx Plan to include a schedule of the Cx process and activities, individual <br />responsibilities, documentation requirements, communication and reporting protocols, and <br />evaluation procedures. <br />2. Review the design stage documents for legibility, completeness, and consistency with the OPR <br />and the BoD and appropriate coordination among the disciplines. MBP anticipates providing one <br />review of the current (95%) construction documents (CDs) and a final back check of the 100% <br />CDs. Scope includes review of the design team’s responses to the Cx design review comments. <br />3. Track and document issues, deviations, and resolutions relating to the Owner’s Project <br />Requirements and design documents in the design phase Cx issues Log. <br />4. Prepare Cx specifications for inclusion into the CD specifications manual. Cx specifications <br />inform the contractors of their roles and responsibilities throughout the Cx process. <br /> <br />Construction Phase Services <br />MBP will: <br />1. Conduct one on-site Cx process scoping/kickoff meeting for the purpose of assisting the selected <br />General Contractor (GC) and installing subcontractors (hereinafter collectively referred to as the <br />“Contractor”) in incorporating the Cx activities into the construction schedule; and defining roles <br />and responsibilities. <br />Docusign Envelope ID: 7CA4BC4F-3EF8-44C1-B1B9-12DF26878683