Browse
Search
Abstract for Joint Meeting Discussion Items
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 02-17-2025 Joint Meeting with the Hillsborough Board of Commissioners
>
Abstract for Joint Meeting Discussion Items
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2025 7:39:53 PM
Creation date
2/11/2025 7:39:38 PM
Metadata
Fields
Template:
BOCC
Date
2/17/2025
Meeting Type
Municipalities
Document Type
Agenda
Document Relationships
Agenda for February 17, 2025 Joint Meeting with Hillsborough Board of Commissioners
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 02-17-2025 Joint Meeting with the Hillsborough Board of Commissioners
Minutes 02-17-2025-Joint Meeting w Hillsborough
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
67 <br /> Hillsborough Landfill (NONCD0000483) Remedial Investigation Work Summary <br /> Ziqiang Chen,PhD,Environmental Engineer II <br /> Pre-Regulatory Landfill Program,Superfund Section <br /> NCDEQ,Division of Waste Management <br /> 1646 Mail Service Center <br /> Raleigh,NC 27699-1646 <br /> (919)508-7144 <br /> zi-giang.chens@deg.nc.Gov <br /> 2024.08.16, Raleigh,NC <br /> 1). PRLF started the initial site investigation in later July or early August 2017. The Fist Phase <br /> Investigation Report completed and approved on May 29, 2018. (see Figs. 1 & 2 below). <br /> 2). The site waste delineation (waste boundary outline)was completed on November 23, 2018. (see Fig. <br /> 3, from 483DP-3 Report). <br /> 3). Initial site field work for above-ground landfill gas survey (Fig.4—methane gas monitoring; Fig. 5- <br /> mercury sampling), surface water(Fig. 6) and sediments (Fig. 7), were completed on January 17, 2019 <br /> (483DP-6 Report). <br /> 4). Groundwater monitoring wells were installed in Tasks 483DP-7,8& 9 in early 2019, report approved <br /> on June 20, 2019 (Fig. 8, groundwater monitoring wells location map. 483DP-9 Report); Following-up 3- <br /> month groundwater monitoring reports were approved on July 19, 2019 (Fig.9 Groundwater flow <br /> direction; and Fig. 10 groundwater sampling results. 483DP-12 Report). <br /> 5). Scattered pockets of wastes in the site were investigated in 483DP-14 report. Additional RI <br /> investigations were conducted and reported in 483DP-15,16& 17 report. <br /> 6). Comprehensive landfill gas sampling and analyses, potable well sampling, and surface <br /> water/sediments investigations were conducted during the years of 2020 through 2023. The final 483DP- <br /> 19-25 Report was approved on March 24, 2024. The key results include: Fig. 11 - Site Landfill gas <br /> monitoring results; Fig. 12— Potable well monitoring results; and Fig. 13,following-up surface <br /> water/sediments monitoring. <br /> 7). The anticipated date for completion of the site's investigation work in December, 2024. <br />
The URL can be used to link to this page
Your browser does not support the video tag.