Orange County NC Website
63 <br /> Figure 4.4. Potential Growth Areas <br /> Ce vaa.00nai ivwKoo <br /> MCcmwm.,rea <br /> Sewer Capacity Connection to Land Use Plans ms <br /> a ��� �ry�a�ary <br /> --�rsUsee �ry <br /> • The CSP recommendations: ;-- <br /> • Reduction of the Urban Service Boundary to <br /> p p g <br /> revent/reduces sprawl and encourage consolidated <br /> infrastructure. This will impact the WASAMPBA _ p <br /> agreement and necessitate updates. <br /> a <br /> • Adjusting the UDO during the re-write to include <br /> more flexibility through zoning for lot size, density, <br /> and housing types . Po <br /> � F L_ armx rn <br /> f a§ <br /> • Future alignment of the FLUM with Fig. 4.4 <br /> (Potential Growth Areas) This will impact the COCA sfgnf an9�°erandp�sY,,, -agreement a n d JPA with Hillsborou g h and Orange Improvements depending on type of <br /> land use proposed and available Flow <br /> and capacity ofthesystem. <br /> County. <br /> S-r-TheT wn of Wkh—r gh <br /> FeTIMMIMINER1100-Mom s v <br />