Orange County NC Website
56 <br /> Water & Sewer Capacity Status �G�� <br /> • Reported to Town Board on sewer capacity in Mar. and <br /> Aug. 2021, Nov. 2022, Jan. 2025 <br /> • Projection through 2040 - K„ <br /> • Projects based upon water capacity spreadsheet provided by planning, ' <br /> department— committed and potential <br /> A <br /> • River basin is capacity constrained due to wet weather . <br /> • Monitor Elizabeth Brady basin <br /> • Other smaller pumping stations projected capacity concerns Pump Station Basins WE � <br /> �+ •.yCOG� �we6NN,G.M Finu% <br /> • Currently working on water system capacity modeling <br /> •^�• Gravity Sewer Malrvs nava <br /> twin axa urameec(metes) . <br /> n crwar <br /> • Currently evaluating long term wastewater options ~ . =v <br /> -4— ■ <br /> w�» <br /> F <br /> ®MRSIMIN&MMOMM6 s <br />