Browse
Search
OUTBoard Feb 17 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Feb 17 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2025 3:01:48 PM
Creation date
2/11/2025 3:00:26 PM
Metadata
Fields
Template:
BOCC
Date
2/17/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North Carolina Department of Transportation 1/7/2025 <br /> Active Projects Under Construction - Orange Co. <br /> Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion <br /> Number Number Engineer Amount Date Date Date Completion Schedule Percent <br /> Date Percent <br /> C204632 1-3306A WIDENING 1-40 FROM 1-85 IN ORANGE COUNTY TO THE DURHAM THE LANE Crews, PE, Jacob $236,457,869.00 9/27/2021 9/1/2025 10/28/2021 6/17/2026 58 53.64 <br /> COUNTY LINE AND 1-40 WESTBOUND IN DURHAM COUNTY NEAR CONSTRUCTION T <br /> US-15/501 . CORPORATION <br /> C204806 RESURFACING 27 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell, Bobby J $4,512,658.45 3/15/2023 9/15/2024 5/22/2023 12/5/2024 100 100 <br /> LLC <br /> C204905 10 SECTIONS OF SECONDARY ROADS CAROLINA SUNROCK Howell, Bobby J $3,783,925.02 4/1/2024 10/1/2025 7/2/2024 10/1/2025 36.6 39.98 <br /> LLC <br /> DG00631 R-5787FA INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. EASTERN Howell, Bobby J $919,609.00 3/18/2024 3/18/2026 5/21/2024 3/18/2026 49 48.13 <br /> UPGRADING OF NON-COMPLIANT ADA CURB RAMPS EARTHSCAPRES AND <br /> CONSTRUCTION LLC <br /> DG00633 R-5787K INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES. HOLLINS Howell, Bobby J $992,602.20 3/18/2024 3/18/2026 5/6/2024 3/18/2026 50 76.25 <br /> UPGRADING OF NON-COMPLIANT ADA CURB RAMPS CONSTRUCTION <br /> SERVICES INC <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.