Browse
Search
OUTBoard Feb 17 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Feb 17 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2025 3:01:48 PM
Creation date
2/11/2025 3:00:26 PM
Metadata
Fields
Template:
BOCC
Date
2/17/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> BP7-R015 Replace Bridge#86 on SR 1942 (Jones Ferry Road) 9/6/2029 FY2031 $1,700,000 Planning and design activities underway. Daniel Dagenhart <br /> Detour needs improvements so will need <br /> to see if resurfacing funds available or <br /> switch to TIP project. TBD <br /> U-5845 Widen SR 1009(South Churton Street)to multi-lanes from 7/16/2030 FY2033 $49,238,000 PE funding approved 5/14/15, Planning Radha Attaluri <br /> 50235.1.1 1-40 to Eno River in Hillsborough and Design activities underway, <br /> 50235.2.1 Coordinate with 1-0305B which was <br /> 50235.3.1 formerly 1-5967. <br /> BP7-R007 Replace Bridge#63 on Pleasant Green Road 9/5/2030 FY2033 $2,500,000 Planning and design activities underway Daniel Dagenhart <br /> 1-0305B Interchange improvements at 1-85 and SR 1009 (South 10/15/2030 FY2033 $16,900,000 PE funding approved 9/8/17, Planning Colin Mellor <br /> 34142.1.5 Churton Street)in Hillsborough and Design activities underway, <br /> 34142.3.3 Coordinate with 1-0305 and U-5845. (I- <br /> 34142.3.4 0305B was formerly 1-5967) <br /> 34142.2.4 <br /> R-5821A Construct operational improvements including 6/17/2031 FY2033 $7,000,000 PE funding approved 10/10/17, design Suzana Matta <br /> 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR activities currently suspended, <br /> 47093.2.2 1006(Orange Grove Road)to SR 1107/SR 1937(Old Coordinating with NC54 West Corridor <br /> 47093.3.2 Fayetteville Road). Study <br /> 1-0305(A) Widening of 1-85 from west of SR1006(Orange Grove 1/20/2032 FY2036 $132,000,000 PE funding approved 6/5/18, Planning Colin Mellor <br /> 34142.1.2 Road)in Orange Co.to west of SR 1400(Sparger Road)in and design activities underway, Project <br /> 34142.2.2 Orange Co. reinstated per 2020-2029 STIP(funded <br /> 34142.3.2 project)and delete project 1-5983 <br /> 1-0305C Interchange improvements at 1-85 and NC 86 in 11/16/2032 FY2035 $20,900,000 PE funding approved 10/10/17, Planning Colin Mellor <br /> 34142.1.6 Hillsborough and Design activities underway, 1-0305C <br /> was formerly 1-5984. <br /> C-5181 Jones Creek Greenway Project-Fill Gap between the TBD TBD $654,000 Environmental document approved Town of <br /> Carrboro Upper Bolin Trail and Twin Creeks Greenway and 8/14/23. NCDOT to review plans once Carrboro/Stephen <br /> also implement program to support on-vehicle trips to Carrboro develops and submits. Robinson <br /> Morris Grove Elementary School <br /> Page 4 DCHCMPO Dec 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.