Orange County NC Website
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> EB-5721 Upgrade existing off-road path and construct new section 9/25/2025 FY2026 $2,400,000 Bids opened 7/17/23-Bids rejected. Town of Chapel <br /> of path of Bicycle Route#1 from Cleland Drive to Willow Project on Hold. Chapel Hill to seek Hill/Stephen Robinson <br /> Drive in Chapel Hill additional funding and relet at a future <br /> date. <br /> HS-2007J Install a new crosswalk with Rapid Rectangular Flashing 11/16/2025 6/30/2026 $530,000 Planning and deisgn activities underway Suzana Matts <br /> Beacons(RRFB), raised center island, pedestrian signage, <br /> and approximately 125 linear feet of sidewalk on NC 86 at <br /> Critz Drive in Chapel Hill <br /> HO-0013 Chapel Hill from Franklin Street and Rosemary Street, and 2/26/2026 FY28 $2,100,000 Project approved by BOT and assigned. Stephen Robinson <br /> 51177.1.1 the streets in between from Merritt Mill Road to Henderson Municipal agreement executed. <br /> 51177.2.1 Street in downtown Chapel Hill. Install new mast arm and <br /> 51177.2.2 <br /> 51177.3.1 curb and sidewalk improvements. <br /> C-5650 Construct sidewalk on one side of SR 1919 (Smith Level 4/19/2026 FY2028 $1,718,000 Carrboro approved to incorporate water Town of <br /> Road/S. Greensboro St.)from Public Works Drive to the line work into design. Env doc returned w Carrboro/Stephen <br /> northern end of Old Pittsboro Road in Carrboro comments on 12/10/21. Document to be Robinson <br /> updated to include additional limits for <br /> resurfacing. NCDOT waiting on revised <br /> 1-3306AC 1-40 at NC 86-Upgrade to superstreet from Northwood 5/19/2026 FY2029 $4,350,000 Planning and design activities underway Radha Attaluri <br /> Drive to Ramp C/D at 1-40 interchange <br /> BP7-R009 Replace Bridge#11 on SR 1336 (Halls Mill Road) 9/17/2026 FY2029 $2,900,000 Planning and design activities underway Daniel Dagenhart <br /> ROW acquisisition complete. <br /> EB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from 9/17/2026 FY2029 $848,000 Municipal agreement needs to be Town of <br /> SR 1772 (North Greensboro Street)to south of Norfolk requested and executed to begin work. Carrboro/Stephen <br /> Southern Railroad Tracks in the Town of Carrboro Robinson <br /> EB-5998 Construct MUP on US 15/501 from Willow Drive to SR 9/30/2026 FY2028 $2,044,000 Municipal agreement needs to be Town of Chapel <br /> 1741/SR 1838(Old Durham Chapel Hill Road)in Chapel requested and executed to begin work. Hill/Stephen Robinson <br /> Hill <br /> Page 2 DCHCMPO Dec 2024 <br />