Browse
Search
OUTBoard Feb 17 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Feb 17 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2025 3:01:48 PM
Creation date
2/11/2025 3:00:26 PM
Metadata
Fields
Template:
BOCC
Date
2/17/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-6207T Portions of Twenty-One (21)Routes. Curve Warning Sign 9/20/2023 9/30/25 $200,000 Planning and design activities underway. Dawn McPherson <br /> 51112 Installation. Construction started. <br /> SS-6207A NC 54 Pedestrian improvements between SR 1902 2/15/2024 6/1/2025 $171,000 Planning and design activities underway. Dawn McPherson <br /> 50337 (Manning Drive)and SR 1937 (Old Fayetteville Road)in Materials have arrived and work has <br /> Chapel Hill and Carrboro. Improvements will include begun. 4 of the 5 locations have been <br /> refuge islands, crosswalks and pedestrian signals. completed. <br /> Improvements to be completed by state forces. <br /> SS-6207AF SR 1004 (Efland-Cedar Grove Road)at SR 1306 (Lebanon 7/1/2024 7/1/2024 $25,000 Planning and design activities underway. Dawn McPherson <br /> 51427 Road),west of Hillsborough. Convert intersection to all way Project complete. <br /> stop traffic control (without flasher). <br /> U-4726DF Bicycle detection at signalized intersections in Carrboro 8/15/2024 Spring 2025 $130,000 Plans at 90%completion-Plan review Town of <br /> comments returned back to the Town of Carrboro/Stephen <br /> Carrboro for revisions. Re-Let Robinson <br /> Department has concurred for the <br /> contract to be awarded. <br /> BL-0044 NC 54 from Westbrook Drive in Carrboro to west of US 1/16/2025 7/31/2025 $1,311,000 Construction funding to be requested Trung Nguyen <br /> 49998.1.1 15/501/NC 86(South Columbia Street)interchange in once municipal agreements are <br /> Chapel Hill. Construct sidewalk and install pedestrian executed. Chapel Hill MA executed, <br /> signals, crosswalks, and refuge islands at selected Carrboro MA has also been executed. <br /> locations. Utility Relocations near completion. <br /> P-5701 B Construct Platform, Passenger Rail Station Building at 6/30/2025 FY2026 $7,200,000 PE funding scheduled 7/1/2020. Planning Matthew Simmons <br /> 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough and deisgn activities underway <br /> 46395.3.3 <br /> HL-0045 Repair Bridge#241 on Exchange Park Lane over Eno 7/31/2025 FY2028 $153,800 Agreement executed, Hillsborough to Town of <br /> River from South Churton Street to Faribult Lane in prepare environmental documents and Hillsborough/Stephen <br /> Hillsborough plans. Review of final plans underway. Robinson <br /> BR-0092 Replace Bridge#37 on NC 86 over New Hope Creek 8/19/2025 FY2028 $2,900,000 Planning and design activities underway Alexander Foster <br /> Page 1 DCHCMPO Dec 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.