Orange County NC Website
Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br /> <br />Addendum 3 ADD 3-2 <br />ii. Surface mounted hall stations are acceptable however, all wiring shall remain in- <br />wall. <br />iii. Provide new packings <br />iv. New oil <br />v. New Victaulic fittings, clamps and rubber seals (where applicable) <br />vi. New shut off valves (pit and machine rooms) <br /> <br />Drawings: <br /> <br />1. Cedar Grove Community Center: <br />a. Clarification: Reference A0-01 for photos of furniture and casework. <br /> <br />2. Whitted Windows: <br />a. Clarification: Base Bid and Alternate windows are designated by labeled dimension <br />strings to the sides of the elevation drawings. <br />b. Add: Existing floor plans have been provided as a supplementary document to show <br />where interior partitions intersect windows. Note that attached revised 012200 stipulates <br />how Up/A-2A is to be used. <br />c. Clarification: It should be assumed that lay-in ceilings and blinds will need to be <br />temporarily removed and reinstalled as windows are replaced. <br />d. Revised: A6-12 – Details Revised to show existing interior frame more accurately with <br />trim and wood nailer blocking to remain. Interior snap trim and exterior panning at full <br />perimeter as shown. Provide necessary connector panning for multi-window assemblies. <br />Cornice details and notes have been revised. Sandblasting is no longer required for <br />prepping cornice for paint. <br /> <br />3. Peidmont Food Processing: <br />a. Revised: A1-01 - Delete last sentence of the Demolition Keynote 1 description regarding <br />the toothing of CMU. <br /> <br />4. Animal Services Flooring: <br />a. Integrated Epoxy Wall Base height is 4” <br /> <br /> <br />Specifications: <br /> <br />1. Revised: 01 22 00 Unit Prices – Unit price Up/A-2C has been added for replacement of damaged <br />wood blocking at window openings. Up/A-2A and Up/A-2B descriptions are shown as revised in <br />Addendum 1. Note additional detail in these descriptions. <br /> <br />2. Revised: 01 21 00 Allowances - Unit price Up/A-2C has been added. Allowances A-4A, A-5A, A- <br />6A have been added to capture the allowances for elevator cab interior finishes as described in the <br />Otis proposals. <br /> <br />3. Revised: 00 42 00 Proposal Form - Unit price Up/A-2C has been added. Lump sum allowances A- <br />4A, A-5A, A-6A have been added to capture the allowances for elevator cab interior finishes as <br />described in the Otis proposals. Animal Services Alternate 6 added (see below). <br /> <br />4. Revised: 01 50 00 Temporary Facilities - 3.2 – F: Use of building power during renovation work is <br />permitted. <br /> <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D