Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br /> <br />ALTERNATES 01 23 00 - 3 <br />be added to the Base Bid for providing all labor and materials indicated and required to accomplish Work <br />involved in providing the Owner Preferred Manufacturers Listed Below: <br />1. List of Preferred Manufacturers- Otis Elevator Co. - Refer to Section 14 24 00 <br />M. Alternate 13; Owner Preferred Manufacturer – First Fire Protection Inc. 919.233.6997 Anthony <br />Stanley <br />The owner has found the following brand/product(s) to be superior in application and durability. Per <br />GS133-3, the flowing are required to be bid as an alternate to the base specification. State the amount to <br />be added to the Base Bid for providing all labor and materials indicated and required to accomplish Work <br />involved in providing the Owner Preferred Manufacturers Listed Below: <br />1. List of Preferred Manufacturers- First Fire Protection Inc <br />Gateway Center Elevator Modernization <br />A. Alternate 1; Owner Preferred Manufacturer – Otis Elevators <br />The owner has found the following brand/product(s) to be superior in application and durability. Per <br />GS133-3, the flowing are required to be bid as an alternate to the base specification. State the amount to <br />be added to the Base Bid for providing all labor and materials indicated and required to accomplish Work <br />involved in providing the Owner Preferred Manufacturers Listed Below: <br />1. List of Preferred Manufacturers- Otis Elevator Co. - Refer to Section 14 24 00 <br />B. Alternate 2; Owner Preferred Manufacturer – Pinnacle Fire Systems Inc. Bart Arthurs <br />bart@pinnaclefire.com 919.367.0240 <br />The owner has found the following brand/product(s) to be superior in application and durability. Per <br />GS133-3, the flowing are required to be bid as an alternate to the base specification. State the amount to <br />be added to the Base Bid for providing all labor and materials indicated and required to accomplish Work <br />involved in providing the Owner Preferred Manufacturers Listed Below: <br />1. List of Preferred Manufacturers- Pinnacle Fire Systems. <br />Orange County Courthouse Elevator Modernization <br />A. Alternate 1; Owner Preferred Manufacturer – Otis Elevators <br />The owner has found the following brand/product(s) to be superior in application and durability. Per <br />GS133-3, the flowing are required to be bid as an alternate to the base specification. State the amount to <br />be added to the Base Bid for providing all labor and materials indicated and required to accomplish Work <br />involved in providing the Owner Preferred Manufacturers Listed Below: <br />1. List of Preferred Manufacturers- Otis Elevator Co. - Refer to Section 14 24 00 <br />B. Alternate 2; Owner Preferred Manufacturer –Siemens Industry Inc. Nelson Ciuffardi <br />nelson.ciuffardi@siemens.com 984.389.5833 <br />The owner has found the following brand/product(s) to be superior in application and durability. Per <br />GS133-3, the flowing are required to be bid as an alternate to the base specification. State the amount to <br />be added to the Base Bid for providing all labor and materials indicated and required to accomplish Work <br />involved in providing the Owner Preferred Manufacturers Listed Below: <br />1. List of Preferred Manufacturers- Siemens Industry Inc. <br /> <br />Orange County Animal Services <br />A. Alternate 1; Scope – Food Prep 121 Flooring: State the amount to be added to the Base Bid for <br />providing all labor and materials indicated and required to accomplish Work involved in providing <br />flooring replacement in the above listed portion of the building. <br /> <br />B. Alternate 2; Scope – Stray Cat 138 Flooring: State the amount to be added to the Base Bid for <br />providing all labor and materials indicated and required to accomplish Work involved in providing <br />flooring replacement in the above listed portion of the building. <br /> <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.