Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br /> <br />ALTERNATES 01 23 00 - 1 <br />SECTION 01 23 00 - ALTERNATES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br />other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes administrative and procedural requirements for alternates. <br />1.3 DEFINITIONS <br />A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the <br />Bidding Requirements that may be added to the Base Bid amount if Owner decides to accept a <br />corresponding change either in the amount of construction to be completed or in the products, materials, <br />equipment, systems, or installation methods described in the Contract Documents. <br />1. The cost or credit for each alternate is the net addition to the Contract Sum to incorporate alternate <br />into the Work. No other adjustments are made to the Contract Sum. <br />1.4 PROCEDURES <br />A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the <br />alternate into Project. <br />B. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to <br />or required for a complete installation whether or not indicated as part of alternate. <br />C. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the <br />status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later <br />consideration. Include a complete description of negotiated modifications to alternates. <br />D. Execute accepted alternates under the same conditions as other work of the Contract. <br />E. Schedule: A Schedule of Alternates is included at the end of this Section. Specification Sections <br />referenced in schedule contain requirements for materials necessary to achieve the work described under <br />each alternate. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 SCHEDULE OF ALTERNATES <br /> <br />Cedar Grove Community Center – Flooring Replacement <br />A. Alternate 1; Owner Preferred Manufacturer – Tarkett Sports Indoor <br />The owner has found the following brand/product(s) to be superior in application and durability. Per <br />GS133-3, the flowing are required to be bid as an alternate to the base specification. State the amount to <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D