Orange County NC Website
Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br /> <br /> <br /> <br /> <br /> <br />ALLOWANCES 01 21 00 - 4 <br /> <br /> <br /> <br />Allowance No. Up/A-2; Flashing Repair/Repointing Above Cornice: <br /> Allow an amount per linear foot to repair flashing and or repoint brick above the metal cornice of the Whitted <br />Building. <br /> Quantity: 100 LF <br /> <br />Allowance No. Up/A-2A; Walls Terminating at Windows <br /> Allow an amount per linear foot (measured vertically) to repair wall terminations at windows as they are re- <br />placed. Whitted Building. <br /> Quantity: 100 LF <br /> <br />Allowance No. Up/A-2B; Ceilings Terminating at Windows <br /> Allow an amount per linear foot (measured horizontally) to repair suspended ceiling edge at windows as they <br />are replaced. Whitted Building. <br /> Quantity: 300 LF <br /> <br />Allowance No. A-3; General Contingency – Cedar Grove Community Center: <br /> Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of <br />subcontracts, materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be <br />provided within the contract price. If there is unused allowance at the conclusion of the project, the allowance <br />plus 15% will be deducted from the contract. <br /> Contingency: $25,000 Lump Sum <br /> <br />Allowance No. A-4; General Contingency – Whitted Building Window Replacement: <br /> Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of <br />subcontracts, materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be <br />provided within the contract price. If there is unused allowance at the conclusion of the project, the allowance <br />plus 15% will be deducted from the contract. <br /> Contingency: $60,000 Lump Sum <br /> <br />Allowance No. A-5; General Contingency – Gateway Center Elevator Modernization: <br /> Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of <br />subcontracts, materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be <br />provided within the contract price. If there is unused allowance at the conclusion of the project, the allowance <br />plus 15% will be deducted from the contract. <br /> Contingency: $25,000 Lump Sum <br /> <br />Allowance No. A-6; General Contingency – Orange County Courthouse Elevator Modernization: <br /> Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of <br />subcontracts, materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be <br />provided within the contract price. If there is unused allowance at the conclusion of the project, the allowance <br />plus 15% will be deducted from the contract. <br /> Contingency: $25,000 Lump Sum <br /> <br />Allowance No. A-7; General Contingency – Piedmont Food Processing Center: <br /> Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of <br />subcontracts, materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be <br />provided within the contract price. If there is unused allowance at the conclusion of the project, the allowance <br />plus 15% will be deducted from the contract. <br /> Contingency: $3,000 Lump Sum <br /> <br /> <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D