Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Architectural Renovations Smith Si nnett / 2023036 <br />Hillsborough, NC Orange County Asset Man agement Services <br /> <br />PROPOSAL FORMS Proposal - 4 <br />Orange County Animal Services <br />BASE BID: <br /> <br />Amount: Dollars ($ ) <br /> <br />ALTERNATE 1: <br /> <br />Amount: Dollars ($ ) <br /> <br />ALTERNATE 2: <br /> <br />Amount: Dollars ($ ) <br /> <br />ALTERNATE 3: <br /> <br />Amount: Dollars ($ ) <br /> <br />ALTERNATE 4: <br /> <br />Amount: Dollars ($ ) <br /> <br />ALTERNATE 5: <br /> <br />Amount: Dollars ($ ) <br /> <br /> <br /> <br />MAJOR SUBCONTRACTORS if any (Name, City & State) <br /> <br />General Subcontractor: Roofing Subcontractor: <br /> <br /> Lic Lic <br /> <br />Mechanical Subcontractor: Electrical Subcontractor: <br /> <br /> Lic Lic <br /> <br /> <br />GS143-128(d) requires all single prime bidders to identify their subcontractors for the above subdivisions of work. A contractor whose bid is <br />accepted shall not substitute any person as subcontractor in the place of the subcontractor listed in the original bid, excep t (i) if the listed <br />subcontractor's bid is later determined by the contractor to be non-responsible or non-responsive or the listed subcontractor refuses to enter into a <br />contract for the complete performance of the bid work, or (ii) with the approval of the awarding authority for good cause sho wn by the contractor. <br /> <br /> <br /> <br />ALLOWANCES - (Refer to Division 01 Section 01 21 00 – Allowances for amounts to be included in bid shall <br />be based on the Unit Prices provided as part of Section 01 22 00 ) Acknowledge Allowances have been included with <br />in the Base Bid. <br /> <br />UP/A-1 ______________ UP/A-2 _____________ UP/A-2A _____________ UP/A-2B _____________ <br /> <br />A-3______________ A-4 ______________ A-5 ________________ A-6 _______________ <br /> <br /> A-7 _______________ A-8 ______________ <br /> <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.