Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />05/03/2024_CLC Version <br />© OTIS ELEVATOR COMPANY, 2024 All Rights Reserved Page 11 of 21 <br /> <br />Supply and install piping for phone lines into new controllers. <br />Note: Owner must ensure a single use phone line is brought to the elevator machine room from the <br />main building service connection/demarcation point. This line must <br />be ordered at the start of the modernization so as to be available at time of inspection. <br />Owner to provide demark connection, maintenance and phone line service charges. <br />Any modifications or relocating of card access, CCTV, Security or other low voltage items to be <br />completed by owner. They are not included. <br /> <br />LOBBIES <br />No cutting and patching is included in this proposal. If this is required, it will be handled with a <br />change order. <br /> <br />HOISTWAY <br />There are no provisions for patching the hoist way walls included in this proposal. <br />There are no provisions for hoist way ventilation included in this proposal . <br /> <br />PIT <br />Separate lighting and receptacles circuits. <br />Supply and install pit light switch. <br />Supply and install guarded LED fixture. <br />Supply and install GFI. <br />There are no provisions for a sump pump included in this proposal. Leaving existing drain in pit "AS IS <br /> <br />SMOKE DETECTION AND RECALL SYSTEM <br />Note: There are no provisions for any fire alarm upgrades included in this proposal. <br />The owner will be upgrading the existing fire alarm system to a Siemens panel. <br />UCS will provide all necessary conduit and rough in boxes for fire alarm as it pertains to the elevator <br />modernization only. <br />No device installation, programming, or testing is included in this proposal. This will be the <br />responsibility of the owner/Siemens <br /> <br />EMERGENCY POWER <br />No emergency power is included in this proposal <br /> <br />NOT INCLUDED IN CONTRACT <br />The following items must be performed by others and you agree to provide this work in <br />accordance with the applicable codes and enforcing authorities: <br /> BUILDING POWER <br />Provide electrical power for light, tools, hoists, etc. during installation as well as electric current for starting, <br />testing, and adjusting the elevator. Power of permanent characteristics to be provided to properly <br />operate all the elevators concurrently scheduled to be modernized. Power must be a 3-phase 4 wire <br />system with ground and bonded disconnects. Grounded leg delta systems are not acceptable. <br /> <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.