Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />05/03/2024_CLC Version <br />© OTIS ELEVATOR COMPANY, 2024 All Rights Reserved Page 10 of 21 <br />NEW HALL BUTTONS <br />New hall buttons shall be installed at each landing. An up button and a down button at each <br />intermediate landing and a single button at each terminal landing shall be installed. All buttons, <br />when applicable, shall be long-life LED illumination. <br /> <br />NEW HALL POSITION INDICATOR <br />Hall position indicators shall be installed at: Car 1/Unit 1 Front: 1,2,3, landing(s). The position of the <br />car in the hoistway shall be shown by the illumination of the indicator corresponding to the landing <br />that the car is stopped or passing. <br /> <br /> <br />Section 8 <br /> <br /> <br /> <br />HEALTH PRODUCTS <br /> <br /> <br />No Health Products Specified <br /> <br /> <br />Section 9 <br /> <br /> <br /> <br />WORK BY OTHERS <br /> <br />INCLUDED IN CONTRACT <br /> <br />MACHINE ROOM <br />Retain the existing machine room door. <br />Supply and install all required signage and extinguishers. <br />Replace through wall AC unit in machine room. <br />Supply and install car light circuit with lockable disconnects. <br />Supply and install feeder from the load side of the car light disconnect to controller. <br />Supply and install auxiliary contacts for battery lowering and associated wiring into the controller. <br />Supply and install piping for main feeder into controller from main disconnect. <br />Supply and install LED lamp guarded fixtures. <br />Supply and install machine room GFI. <br />Supply and install positive earth ground to main controller. <br />No short circuit coordination, arc flash, or selective coordination studies are included. <br />This proposal is based on a new motor same HP as existing. <br />Supply and install circuit and disconnect for 2-way communication. <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.