Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />05/03/2024_CLC Version <br />© OTIS ELEVATOR COMPANY, 2024 All Rights Reserved Page 10 of 21 <br /> <br /> <br />NEW HALL POSITION INDICATOR <br />Hall position indicators shall be installed at: Hydrofit Plus Favorite/Unit 1 Front: 1, landing(s). The <br />position of the car in the hoistway shall be shown by the illumination of the indicator corresponding <br />to the landing that the car is stopped or passing. <br /> <br /> <br />Section 8 <br /> <br /> <br /> <br />HEALTH PRODUCTS <br /> <br /> <br />No Health Products Specified <br /> <br /> <br />Section 9 <br /> <br /> <br /> <br />WORK BY OTHERS <br /> <br /> <br /> <br />INCLUDED IN CONTRACT <br /> <br />Machine Room <br />Retain the existing machine room door. <br />Supply and install all required signage and extinguishers. <br />Leaving the existing sprinkler head in the machine room "AS IS." No modifications by Otis. <br />Supply and install actuator and thermostat to the existing supply air vent in the machine room. <br />Note: If the AHJ requires another means of cooling the machine room, this will be handled with a <br />change order. Supply and install circuit and disconnect for mini -split. <br />Supply and install car light circuit with lockable disconnects. <br />Supply and install feeder from the load side of the car light disconnect to controller. <br />Supply and install auxiliary contacts for battery lowering and associated wiring into the controller. <br />Supply and install piping for main feeder into controller from main disconnect. <br />Supply and install LED lamp guarded fixtures. <br />Supply and install machine room GFI. <br />Supply and install positive earth ground to main controller. <br />No short circuit coordination, arc flash, or selective coordination studies are included. <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.