Orange County NC Website
<br /> <br /> <br /> <br />05/03/2024_CLC Version <br />© OTIS ELEVATOR COMPANY, 2024 All Rights Reserved Page 14 of 22 <br />“US/English” to take you to the “USA” web page; (3) clicking on the “Otis Safety” link on the left side of the <br />page; and (4) downloading the “Lockout Tagout Policy Otis 6.0” and “Mechanical Energy Policy Otis 7.0,”, <br />or the then most current version, both of which are in .pdf format on the right side of the website page. <br />Customer agrees that it will disseminate these procedures throughout its organization to the appropriate <br />personnel who may interact with Otis personnel while Otis personnel are working on si te at Customer’s <br />facility. <br /> CONFINED SPACES <br />The machine room, hoistway, pit and mezzanine (“Elevator Spaces”) may be considered Permit - Required <br />Confined Spaces as defined by the Occupational Safety and Health Organization (“OSHA”), 29 C.F.R. § <br />1910.146(b) and § 1926 Subpart AA. Otis has a documented process to control or eliminate hazards and <br />classify such Elevator Spaces as non-permit required confined spaces. In the event that the Customer, <br />others, or unique site conditions or hazards (such as chemical manufacturing sites) require Otis to handle <br />such Elevator Spaces as Permit-Required Confined Spaces, the Customer or owner will be responsible for <br />supplying, at its expense, all resources, including monitoring, permitting, attendants and rescue planning <br />associated with handling such Elevator Spaces a s Permit-Required Confined Spaces. The Customer or <br />owner is required to inform Otis of all known or potential hazards related to Elevator Spaces that Otis may <br />be required to access prior to Otis performing any work in such spaces. Further, the Customer or owner is <br />required to communicate any changes in the conditions associated with such Elevator Spaces or activities <br />in or around such spaces that could introduce a hazard into such spaces. <br /> <br /> <br />Section 10 <br /> <br /> <br /> <br />GENERAL REQUIREMENTS <br /> <br /> <br />EXAMINATION OF EQUIPMENT <br />Except insofar as your equipment may be covered by an Otis maintenance or service contract, it is agreed <br />that we will make no examination of your equipment other than that necessary to do the work described in <br />this Contract and assume no responsibility for any part of your equipment except that upon which work has <br />been done under this contract. <br /> <br />RE-MOBILIZATION <br />You agree to pursue and schedule the work by other trades in a timely manner so as to not <br />interrupt our work. Should our crew(s) have to suspend work on the job to await the conclusion of <br />work by others not party to this contract, we shall be entitled to a re-mobilization charge of five <br />thousand ($5,000) dollars. We shall also extend the stated durations to the extent that we are <br />delayed. <br /> <br />INSURANCE <br />OTIS <br />Otis agrees to maintain General Liability coverage in the amount of $1,000,000 per occurrence and <br />$2,000,000 in the aggregate, Automobile Liability in the amount of $1,000,000 Combined Single Limit for <br />Bodily Injury and Property Damage, Worker’s Compensation in statutory limits. Employer’s Liability in the <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D