Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Southern Expansion Smith Sinnett / 2017027 <br />Phase 1 Seymour Center Renovation and Addition Orange County <br />PAINTING 09 91 00 - 7 <br />application. Do not paint surfaces where moisture content exceeds that permitted in manufacturer’s <br />printed directions. <br />5. Wood: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and <br />sandpaper, as required. Sand surfaces exposed to view smooth and dust off. <br />a. Scrape and clean small, dry, seasoned knots, and apply a thin coat of white shellac or other <br />recommended knot sealer before applying primer. After priming, fill holes and imperfections <br />in finish surfaces with putty or plastic wood filler. Sand smooth when dried. <br />b. Prime, stain, or seal wood to be painted immediately upon delivery. Prime edges, ends, faces, <br />undersides, and backsides of wood, including cabinets, counters, cases, and paneling. <br />c. When transparent finish is required, backprime with spar varnish. <br />d. Backprime paneling on interior partitions where masonry, plaster, or other wet wall <br />construction occurs on backside. <br />e. Seal tops, bottoms, and cutouts of unprimed wood doors with a heavy coat of varnish or sealer <br />immediately upon delivery. <br />6. Ferrous Metals: Clean ungalvanized ferrous metal surfaces that have not been shop-coated; remove <br />oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning <br />methods that comply with recommendations of the Steel Structures Painting Council (SSPC). <br />a. Blast steel surfaces clean as recommended by the paint system manufacturer and according to <br />requirements of SSPC specification SSPC-SP 10. <br />b. Treat bare and sandblasted or pickled clean metal with a metal treatment wash coat before <br />priming. <br />c. Touch up bare areas and shop-applied prime coats that have been damaged. Wire-brush, clean <br />with solvents recommended by the paint manufacturer, and touch up with the same primer as <br />the shop coat. <br />7. Galvanized Surfaces: Clean galvanized surfaces with nonpetroleum-based solvents so that the surface <br />is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated <br />from coil stock by mechanical methods. <br />3.3 PREPARATION OF EXISTING SURFACES <br />A. Existing Painted Gypsum Board: Touch up all holes, dents, etc with drywall patching components approved <br />by the paint manufacturer for the intended purpose. Scrape all loose paint off. Sand and taper smooth all <br />rough spots and blemishes. Provide same number of finish c <br />B. Existing Ferrous Metals to Remain: Grind and sand all loose and peeling paint. Sand and feather all edges <br />smooth. Prime bare metal before painting <br />C. Materials Preparation: Carefully mix and prepare paint materials according to manufacturer’s directions. <br />1. Maintain containers used in mixing and applying paint in a clean condition, free of foreign materials <br />and residue. <br />2. Stir material before application to produce a mixture of uniform density; stir as required during <br />application. Do not stir surface film into material. Remove film and, if necessary, strain material <br />before using. <br />3. Use only thinners approved by the paint manufacturer and only within recommended limits. <br />D. Tinting: Tint each undercoat a lighter shade to facilitate identification of each coat where multiple coats of <br />the same material are applied. Tint undercoats to match the color of the finish coat but provide sufficient <br />differences in shade of undercoats to distinguish each separate coat. <br />3.4 APPLICATION <br />A. General: Apply paint according to manufacturer’s directions. Use applicators and techniques best suited for <br />substrate and type of material being applied. <br />1. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to <br />formation of a durable paint film. <br />2. Paint colors, surface treatments, and finishes are indicated in the schedules. <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.