Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Architectural Renovations <br />Project No. 2023036 <br />Orange County, NC <br />Pre-Bid Conference Agenda <br />September 30, 2024 at 10:00 a.m. <br />3 <br /> <br /> <br />J. Alternate 10; Scope – Building B West Elevation, Level 2: State the amount to be added to the Base Bid for providing all <br />labor and materials indicated and required to accomplish Work involved in providing window replacement in the above listed <br />portion of the building. <br /> <br />K. Alternate 11; Scope – Building B West Elevation, Level 1: State the amount to be added to the Base Bid for providing all <br />labor and materials indicated and required to accomplish Work involved in providing window replacement in the above listed <br />portion of the building. <br /> <br />L. Alternate 12; Owner Preferred Manufacturer – Otis Elevators: <br />The owner has found the following brand/product(s) to be superior in application and durability. Per GS133 -3, the flowing <br />are required to be bid as an alternate to the base specification. State the amount to be added to the Base Bid for providing all <br />labor and materials indicated and required to accomplish Work involved in providing the Owner Preferred Manufacturers <br />Listed Below: <br /> List of Preferred Manufacturers- Otis Elevator Co. - Refer to Section 14 24 00 <br /> <br />Gateway Center Elevator Modernization <br />A. Alternate 1; Owner Preferred Manufacturer – Otis Elevators <br />The owner has found the following brand/product(s) to be superior in application and durability. Per GS133 -3, the flowing <br />are required to be bid as an alternate to the base specification. State the amount to be added to the Base Bid for providing all <br />labor and materials indicated and required to accomplish Work involved in providing the Owner Preferred Manufacturers <br />Listed Below: <br /> List of Preferred Manufacturers- Otis Elevator Co. - Refer to Section 14 24 00 <br />Orange County Courthouse Elevator Modernization <br />A. Alternate 1; Owner Preferred Manufacturer – Otis Elevators <br />The owner has found the following brand/product(s) to be superior in application and durability. Per GS133 -3, the flowing <br />are required to be bid as an alternate to the base specification. State the amount to be added to the Base Bid for providing all <br />labor and materials indicated and required to accomplish Work involved in providing the Owner Preferred Manufacturers <br />Listed Below: <br /> List of Preferred Manufacturers- Otis Elevator Co. - Refer to Section 14 24 00 <br />Orange County Animal Services <br />A. Alternate 1; Scope – Food Prep 121 Flooring: State the amount to be added to the Base Bid for providing all labor and <br />materials indicated and required to accomplish Work involved in providing flooring replacement in the above listed portion <br />of the building. <br /> <br />B. Alternate 2; Scope – Stray Cat 138 Flooring: State the amount to be added to the Base Bid for providing all labor and <br />materials indicated and required to accomplish Work involved in providing flooring replacement in the above listed portion <br />of the building. <br /> <br />C. Alternate 3; Scope – Kitten 139 Flooring: State the amount to be added to the Base Bid for providing all labor and materials <br />indicated and required to accomplish Work involved in providing flooring replacement in the above listed portion of the <br />building. <br /> <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.