Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Architectural Renovations <br />Project No. 2023036 <br />Orange County, NC <br />Pre-Bid Conference Agenda <br />September 30, 2024 at 10:00 a.m. <br />2 <br /> <br />13. For mailed bids, it is the contractor’s responsibility to ensure the bid arrives prior to the bid opening time. <br />Place the bid in a double envelope with “Sealed Bid Do Not Open” written on the envelope. <br /> <br /> <br />III Alternates / Allowances: <br /> <br /> ALTERNATES: <br /> <br />Cedar Grove Community Center – Flooring Replacement <br />A. Alternate 1; Owner Preferred Manufacturer – Tarkett Sports Indoor <br />The owner has found the following brand/product(s) to be superior in application and durability. Per GS133 -3, the flowing <br />are required to be bid as an alternate to the base specification. State the amount to be added to the Base Bid for providing all <br />labor and materials indicated and required to accomplish Work involved in providing the Owner Preferred Manufacturers <br />Listed Below: <br /> List of Preferred Manufacturers- Tarkett Sports Indoor. - Refer to Section 09 65 66 <br />Whitted Building Improvements <br />A. Alternate 1; Scope – Building A South Elevation, Level 1: State the amount to be added to the Base Bid for providing all <br />labor and materials indicated and required to accomplish Work involved in providing window replacement in the above listed <br />portion of the building. <br /> <br />B. Alternate 2; Scope – Building A East Elevation, Level 1 and Level 2: State the amount to be added to the Base Bid for <br />providing all labor and materials indicated and required to accomplish Work involved in providing window replacement in <br />the above listed portion of the building. <br /> <br />C. Alternate 3; Scope – Building A West Elevation, Level 1: State the amount to be added to the Base Bid for providing all <br />labor and materials indicated and required to accomplish Work involved in providing window replacement in the above listed <br />portion of the building. <br /> <br />D. Alternate 4; Scope – Building A West Elevation, Level 1, Level 2 and Level 3: State the amount to be added to the Base <br />Bid for providing all labor and materials indicated and required to accomplish Work involved in providing window <br />replacement in the above listed portion of the building. <br /> <br />E. Alternate 5; Scope – Building A North Elevation, Level 1, Level 2 and Level 3: State the amount to be added to the Base <br />Bid for providing all labor and materials indicated and required to accomplish Work involved in providing window <br />replacement in the above listed portion of the building. <br /> <br />F. Alternate 6; Scope – Building B North Elevation, Level 2: State the amount to be added to the Base Bid for providing all <br />labor and materials indicated and required to accomplish Work involved in providing window replacement in the above listed <br />portion of the building. <br /> <br />G. Alternate 7; Scope – Building B South Elevation, Level 2 and Level 3: State the amount to be added to the Base Bid for <br />providing all labor and materials indicated and required to accomplish Work involved in providing window replacement in <br />the above listed portion of the building. <br /> <br />H. Alternate 8; Scope – Building B East Elevation, Level 1: State the amount to be added to the Base Bid for providing all <br />labor and materials indicated and required to accomplish Work involved in providing window replacement in the above listed <br />portion of the building. <br /> <br />I. Alternate 9; Scope – Building B West Elevation, Level 3: State the amount to be added to the Base Bid for providing all <br />labor and materials indicated and required to accomplish Work involved in providing window replacement in the above listed <br />portion of the building. <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.