Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br />PENETRATION FIRESTOPPING 07 84 13 - 2 <br />D. Product Test Reports: From a qualified testing agency indicating through-penetration firestop system complies with <br />requirements, based on comprehensive testing of current products. <br />1.5 QUALITY ASSURANCE <br />A. Installer Qualifications: A firm experienced in installing through-penetration firestop systems similar in material, design, <br />and extent to that indicated for this Project, whose work has resulted in construction with a record of successful <br />performance. <br />B. Fire-Test-Response Characteristics: Provide through-penetration firestop systems that comply with the following <br />requirements and those specified in Part 1 "Performance Requirements" Article: <br />1. Through-penetration firestop systems are identical to those tested per testing standard referenced in "Part 1 <br />Performance Requirements" Article. Provide rated systems complying with the following requirements: <br />a. Through-penetration firestop systems correspond to those indicated by reference to through-penetration <br />firestop system designations listed by the following: <br />1) UL in its "Fire Resistance Directory." <br />2) OPL in its "Directory of Listed Building Products, Materials, & Assemblies." <br />3) ITS in its "Directory of Listed Products." <br />1.6 DELIVERY, STORAGE, AND HANDLING <br />A. Deliver through-penetration firestop system products to Project site in original, unopened containers or packages with intact <br />and legible manufacturers’ labels identifying product and manufacturer, date of manufacture, lot number, shelf life if <br />applicable, qualified testing and inspecting agency’s classification marking applicable to Project, curing time, and mixing <br />instructions for multicomponent materials. <br />B. Store and handle materials for through-penetration firestop systems to prevent their deterioration or damage due to moisture, <br />temperature changes, contaminants, or other causes. <br />1.7 PROJECT CONDITIONS <br />A. Environmental Limitations: Do not install through-penetration firestop systems when ambient or substrate temperatures are <br />outside limits permitted by through-penetration firestop system manufacturers or when substrates are wet due to rain, frost, <br />condensation, or other causes. <br />B. Ventilate through-penetration firestop systems per manufacturer’s written instructions by natural means or, where this is <br />inadequate, forced-air circulation. <br />1.8 COORDINATION <br />A. Coordinate construction of openings and penetrating items to ensure that through-penetration firestop systems are installed <br />according to specified requirements. <br />B. Coordinate sizing of sleeves, openings, core-drilled holes, or cut openings to accommodate through-penetration firestop <br />systems. <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.