Orange County NC Website
Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br />SHEET METAL FLASHING AND TRIM 07 62 00 - 1 <br />SECTION 07 62 00 - SHEET METAL FLASHING AND TRIM <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary General <br />Conditions and Division 1 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes sheet metal flashing and trim in the following categories: <br />1. Metal flashing and counterflashing. <br />1.3 RELATED SECTIONS <br />A. The following Sections contain requirements that relate to this Section: <br />1. Division 07 Section "Joint Sealants" for elastomeric sealants. <br />1.4 SUBMITTALS <br />A. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification <br />Sections. <br />B. Product Data including manufacturer’s material and finish data, installation instructions, and general <br />recommendations for each specified flashing material and fabricated product. <br />C. Shop Drawings of each item specified showing layout, profiles, methods of joining, and anchorage <br />details. <br />D. Samples of sheet metal flashing, trim, and accessory items, in the specified finish. Where finish involves <br />normal color and texture variations, include Sample sets composed of 2 or more units showing the full <br />range of variations expected. <br />1. 8-inch- square Samples of specified sheet materials to be exposed as finished surfaces. <br />E. Qualification data for firms and persons specified in the "Quality Assurance" Article to demonstrate their <br />capabilities and experience. Include lists of completed projects with project names and addresses, names <br />and addresses of architects and owners, and other information specified. <br />1.5 QUALITY ASSURANCE <br />A. Installer Qualifications: Engage an experience Installer who has completed sheet metal flashing and trim <br />work similar in material, design, and extent to that indicated for this Project and with a record of <br />successful in-service performance. <br />B. Mockups: Prior to installing sheet metal flashing and trim, construct mockups indicated to verify <br />selections made under Sample submittals and to demonstrate aesthetic effects as well as qualities of <br />materials and execution. Build mockups to comply with the following requirements, using materials <br />indicated for final unit of Work. <br />1. Locate mockups on-site in the location and of the size indicated or, if not indicated, as directed by <br />Architect. <br />2. Notify Architect one week in advance of the dates and times when mockups will be constructed. <br />3. Demonstrate the proposed range of aesthetic effects and workmanship. <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D