Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br />NON PERMEABLE AIR AND VAPOR BARRIERS 07 27 00 - 7 <br />c. Seal the top edge of the membrane where it meets the substrate using termination sealant. <br />Trowel-apply a feathered edge to seal termination to shed water. <br />d. Install through-wall flashing membrane and extend 1/2 inch from outside edge of veneer. <br />Provide end dam flashing as detailed. <br />G. Primary Air/Vapor Barrier Fluid Applied <br />1. Apply by spray or flat trowel a complete and continuous unbroken film of liquid air/vapor and rain <br />barrier membrane. <br />a. For temperatures below 40 degrees F apply one component solvent based bitumen air/vapor <br />barrier membrane at a rate of 18.6 sq.ft./gallon to a uniform wet thickness of 90 mils. <br />2. Spray apply or trowel around all projections and penetrations ensuring a complete and continuous air <br />barrier membrane. <br />3. Allow air barrier membrane to dry as per manufacturers recommendations prior to placement of <br />insulating materials. <br />H. Primary Air Barrier Self Adhered <br />1. Apply self-adhering air/vapor barrier membrane complete and continuous to prepared and primed <br />substrate in an overlapping shingle fashion and in accordance with manufacturer’s recommendations <br />and written instructions. Stagger all vertical joints. <br />a. Prime surfaces as per manufacturers instructions and allow to dry. <br />b. Align and position self-adhering air/vapor barrier membrane, remove protective film and press <br />firmly into place. Ensure minimum 2 inch overlap at all end and side laps of membrane. <br />c. Roll all laps and membrane with a counter top roller to ensure seal. <br />d. At the end of each days work seal the top edge of the membrane where it meets the substrate <br />with termination sealant. Trowel apply a feathered edge to seal termination and shed water. <br />3.4 FIELD QUALITY CONTROL <br />A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections and prepare <br />test reports. <br />B. Inspections: Air barrier materials and installation are subject to inspection for compliance with requirements. <br />Inspections may include the following: <br />1. Continuity of air barrier system has been achieved throughout the building envelope with no gaps or <br />holes. <br />2. Continuous structural support of air barrier system has been provided. <br />3. Masonry and concrete surfaces are smooth, clean and free of cavities, protrusions, and mortar <br />droppings. <br />4. Site conditions for application temperature and dryness of substrates have been maintained. <br />5. Maximum exposure time of materials to UV deterioration has not been exceeded. <br />6. Surfaces have been primed, if applicable. <br />7. Laps in strips and transition strips have complied with minimum requirements and have been shingled <br />in the correct direction (or mastic has been applied on exposed edges), with no fishmouths. <br />8. Termination mastic has been applied on cut edges. <br />9. Strips and transition strips have been firmly adhered to substrate. <br />10. Compatible materials have been used. <br />11. Transitions at changes in direction and structural support at gaps have been provided. <br />12. Connections between assemblies (membrane and sealants) have complied with requirements for <br />cleanliness, preparation and priming of surfaces, structural support, integrity, and continuity of seal. <br />13. All penetrations have been sealed. <br />C. Remove and replace deficient air barrier components and retest as specified above. <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.