Orange County NC Website
Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br />Addendum 1 ADD 1-2 <br />•Floor Finish Legend PC Janitor Closet 117 floor shall be prepped and repainted with <br />epoxy paint in the base bid. Delete Refer to schedule of alternates <br />5.Revised: Animal Services Flooring Replacement - A1-02 Keynotes 3, 4, and 5. Change <br />reference to A1-04 to A5-01. <br />6.Clarification: Animal Services Flooring Replacement The existing flooring shall be removed <br />down to bare floor slab to provide and brand new warranted floor installation. <br />7.Revised: Whitted Window Details (A6-12) has been revised to show panning in keeping with <br />existing windows. Sheet attached. <br />Specifications <br />8.Clarification: Section 01 21 00 Allowances 3.3 - Allowance Up/A-1: Moisture remediation primer <br /> Allowance applies to all projects. It is to be used toward any portion of flooring that does not <br />specifically call for moisture mitigation in the drawings. Refer to drawing finish notes and legend. <br />9.Revised: Section 01 21 00 Allowances 3.3 - Allowances Up/A-2A and Up/A-2B have been added <br />for any necessary repair of walls or ceiling that are attached to windows. This shall not be used for <br />repairing portions of the building damaged as a result of general construction activities. <br />10.Revised : 01 23 00 Alternates <br />•Whitted Building Alternate 13 added for preferred manufacturer, Fire Alarm System. <br />•Gateway Center - Alternate 2 added for preferred manufacturer, Fire Alarm System. <br />•OC Courthouse - Alternate 2 added for preferred manufacturer, Fire Alarm System. <br />11.Revised: 09 65 00 Resilient Flooring and Accessories Specification added <br />12.Revised: 09 65 66 Resilient Athletic Flooring 2.2 Change Drawing Symbol to read SFL to <br />correspond with schedule in drawings. 2.3 Add Tarkolay moisture mitigation slip sheet as basis of <br />design. <br />13.Clarification: 09 65 66 Resilient Athletic Flooring 2.3 Note slip sheet required for moisture <br />mitigation. <br />14.Revised: 09 67 23 Resinous Flooring Specification section added <br />15.Revised: 09 91 00 Painting 2.3 Trench Drain Pits are to be painted with Polysiloxane XLE 80 or <br />equal. <br />16.Clarification: Division 14 Specifications: <br />•For any direct conflicting information between the specification and exhibit reports, the <br />report shall govern unless otherwise clarified in subsequent addenda. <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D