Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br />ALLOWANCES 01 21 00 - 4 <br />Allowance No. Up/A-2; Flashing Repair/Repointing Above Cornice: <br />Allow an amount per linear foot to repair flashing and or repoint brick above the metal cornice of the Whitted Building. <br /> Quantity: 100 LF <br /> <br />Allowance No. A-3; General Contingency Cedar Grove Community Center: <br />Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of subcontracts, <br />materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be provided within the <br />contract price. If there is unused allowance at the conclusion of the project, the allowance plus 15% will be deducted from <br />the contract. <br />Contingency: $25,000 Lump Sum <br />Allowance No. A-4; General Contingency Whitted Building Window Replacement: <br />Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of subcontracts, <br />materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be provided within the <br />contract price. If there is unused allowance at the conclusion of the project, the allowance plus 15% will be deducted from <br />the contract. <br />Contingency: $60,000 Lump Sum <br />Allowance No. A-5; General Contingency Gateway Center Elevator Modernization: <br />Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of subcontracts, <br />materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be provided within the <br />contract price. If there is unused allowance at the conclusion of the project, the allowance plus 15% will be deducted from <br />the contract. <br />Contingency: $25,000 Lump Sum <br />Allowance No. A-6; General Contingency Orange County Courthouse Elevator Modernization: <br />Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of subcontracts, <br />materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be provided within the <br />contract price. If there is unused allowance at the conclusion of the project, the allowance plus 15% will be deducted from <br />the contract. <br />Contingency: $25,000 Lump Sum <br />Allowance No. A-7; General Contingency Piedmont Food Processing Center: <br />Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of subcontracts, <br />materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be provided within the <br />contract price. If there is unused allowance at the conclusion of the project, the allowance plus 15% will be deducted from <br />the contract. <br />Contingency: $3,000 Lump Sum <br />Allowance No. A-8; General Contingency Orange County Animal Services: <br />Contingency allowance shall be provided as follows and the price shall be adjusted based on the actual cost of subcontracts, <br />materials, and labor, excluding overhead and profit. Allowances for overhead and profit shall be provided within the <br />contract price. If there is unused allowance at the conclusion of the project, the allowance plus 15% will be deducted from <br />the contract. <br />Contingency: $25,000 Lump Sum <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.