Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIA Document A701 2018. Copyright ' 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. The American Institute of Architects, <br />American Institute of Architects, AIA, the AIA Logo, and AIA Contract Documents are trademarks of The American Institute of <br />Architects. This draft was produced at 14:05:13 ET on 07/31/2024 under Order No.4104251442 which expires on 03/25/2025, is not for resale, <br />is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documentsfi Terms of Service. To report <br />copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (1700874539) <br />7 <br />ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND <br />§ 7.1 Bond Requirements <br />§ 7.1.1 If stipulated in the Bidding Documents, the Bidder shall furnish bonds covering the faithful performance of the <br />Contract and payment of all obligations arising thereunder. <br />§ 7.1.2 If the furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid. If <br />the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds <br />shall be added to the Bid in determining the Contract Sum. <br />§ 7.1.3 The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds <br />in the jurisdiction where the Project is located. <br />§ 7.1.4 Unless otherwise indicated below, the Penal Sum of the Payment and Performance Bonds shall be the amount of <br />the Contract Sum. <br />(If Payment or Performance Bonds are to be in an amount other than 100% of the Contract Sum, indicate the dollar <br />amount or percentage of the Contract Sum.) <br />« » <br />§ 7.2 Time of Delivery and Form of Bonds <br />§ 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of <br />execution of the Contract. If the Work is to commence sooner in response to a letter of intent, the Bidder shall, prior to <br />commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered <br />in accordance with this Section 7.2.1. <br />§ 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment <br />Bond. <br />§ 7.2.3 The bonds shall be dated on or after the date of the Contract. <br />§ 7.2.4 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix to <br />the bond a certified and current copy of the power of attorney. <br />ARTICLE 8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS <br />§ 8.1 Copies of the proposed Contract Documents have been made available to the Bidder and consist of the following <br />documents: <br />.1 AIA Document A1012017, Standard Form of Agreement Between Owner and Contractor, unless <br />otherwise stated below. <br />(Insert the complete AIA Document number, including year, and Document title.) <br />« » <br />.2 AIA Document A1012017, Exhibit A, Insurance and Bonds, unless otherwise stated below. <br />(Insert the complete AIA Document number, including year, and Document title.) <br />« » <br />.3 AIA Document A2012017, General Conditions of the Contract for Construction, unless otherwise <br />stated below. <br />(Insert the complete AIA Document number, including year, and Document title.) <br />« » <br />.4 Building Information Modeling Exhibit, if completed: <br />« » <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.