Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIA Document A701 2018. Copyright ' 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. The American Institute of Architects, <br />American Institute of Architects, AIA, the AIA Logo, and AIA Contract Documents are trademarks of The American Institute of <br />Architects. This draft was produced at 14:05:13 ET on 07/31/2024 under Order No.4104251442 which expires on 03/25/2025, is not for resale, <br />is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documentsfi Terms of Service. To report <br />copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (1700874539) <br />3 <br />§ 3.1.2 Any required deposit shall be refunded to Bidders who submit a bona fide Bid and return the paper Bidding <br />Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper <br />documents will be deducted from the deposit. A Bidder receiving a Contract award may retain the paper Bidding <br />Documents, and the Bidders deposit will be refunded. <br />§ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders unless specifically offered in the advertisement or <br />invitation to bid, or in supplementary instructions to bidders. <br />§ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes <br />responsibility for errors or misinterpretations resulting from the use of incomplete Bidding Documents. <br />§ 3.1.5 The Bidding Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant <br />of use is conferred by distribution of the Bidding Documents. <br />§ 3.2 Modification or Interpretation of Bidding Documents <br />§ 3.2.1 The Bidder shall carefully study the Bidding Documents, shall examine the site and local conditions, and shall <br />notify the Architect of errors, inconsistencies, or ambiguities discovered and request clarification or interpretation <br />pursuant to Section 3.2.2. <br />§ 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitted by the Bidder in writing <br />and shall be received by the Architect at least seven days prior to the date for receipt of Bids. <br />(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall submit requests <br />for clarification and interpretation.) <br />« Submit to aharris@smithsinnett.com » <br />§ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modifications and <br />interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely <br />upon them. <br />§ 3.3 Substitutions <br />§ 3.3.1 The materials, products, and equipment described in the Bidding Documents establish a standard of required <br />function, dimension, appearance, and quality to be met by any proposed substitution. <br />§ 3.3.2 Substitution Process <br />§ 3.3.2.1 Written requests for substitutions shall be received by the Architect at least ten days prior to the date for receipt <br />of Bids. Requests shall be submitted in the same manner as that established for submitting clarifications and <br />interpretations in Section 3.2.2. <br />§ 3.3.2.2 Bidders shall submit substitution requests on a Substitution Request Form if one is provided in the Bidding <br />Documents. <br />§ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or <br />equipment specified in the Bidding Documents; (2) the reason for the requested substitution; (3) a complete description <br />of the proposed substitution including the name of the material or equipment proposed as the substitute, performance <br />and test data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall <br />include a statement setting forth changes in other materials, equipment, or other portions of the Work, including <br />changes in the work of other contracts or the impact on any Project Certifications (such as LEED), that will result from <br />incorporation of the proposed substitution. <br />§ 3.3.3 The burden of proof of the merit of the proposed substitution is upon the proposer. The Architects decision of <br />approval or disapproval of a proposed substitution shall be final. <br />§ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, such approval shall be set forth in an <br />Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them. <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.