Browse
Search
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-032-E-AMS-Harrod and Assoc. Constructors-Harrod and Assoc. Constructors-OC Architectural Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 3:40:17 PM
Creation date
2/5/2025 3:34:59 PM
Metadata
Fields
Template:
Contract
Date
1/24/2202
Contract Starting Date
1/24/2025
Contract Ending Date
1/27/2025
Contract Document Type
Contract
Amount
$1,689,300.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
520
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESILIENT FLOORING AND ACCESSORIES <br /> <br />09 65 00 - 5 <br />Orange County Architectural Renovations Smith Sinnett / 2023036 <br />Hillsborough, NC Orange County Asset Management Services <br /> <br />G. Install floor tiles on covers for telephone and electrical ducts, building expansion-joint covers, and similar <br />items in installation areas. Maintain overall continuity of color and pattern between pieces of tile installed <br />on covers and adjoining tiles. Tightly adhere tile edges to substrates that abut covers and to cover <br />perimeters. <br /> <br />H. Adhere floor tiles to substrates using a full spread of adhesive applied to substrate to produce a completed <br />installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader <br />marks, and other surface imperfections. <br /> <br /> <br />3.5 CLEANING AND PROTECTION <br />A. Comply with manufacturer's written instructions for cleaning and protection of resilient products. <br />B. Perform the following operations immediately after completing resilient product installation: <br />1. Remove adhesive and other blemishes from exposed surfaces. <br />2. Sweep and vacuum surfaces thoroughly. <br />3. Damp-mop surfaces to remove marks and soil. <br />C. Protect resilient products from marks, indentations, and other damage from construction operations and <br />placement of equipment and fixtures during remainder of construction period. <br />1. Follow manufacturers recommendations for protective flooring treatment or polish. <br />2. Coordinate flooring maintenance with Owner's maintenance service. <br />3. Cover resilient accessories on floors and stairs with undyed, untreated building paper until inspection <br />for Final Acceptance. <br />D. Cover resilient products until Substantial Completion. <br />E. Clean products specified in this Section not more than 4 days prior to dates scheduled for inspections intended <br />to establish date of Final Acceptance in each area of Project. <br />F. Clean products using method recommended by manufacturer. <br /> <br /> <br /> <br />END OF SECTION <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D
The URL can be used to link to this page
Your browser does not support the video tag.