Orange County NC Website
Revised 01/24 1 <br />[Departmental Use Only] <br />TITLE Architectural Projects <br />FY 2024-2025 RFP5436 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER $250,000.00 <br />ORANGE COUNTY <br />THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 22nd day <br />of Janaury, 2025, by and between Harrod and Assoc. Constructors, Inc, (hereinafter called the “Contractor”), <br />and Orange County, a political subdivision of the State of North Carolina, (hereinafter called the “County,” <br />“Orange County,” or “Owner”). <br />W I T N E S S E T H: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1. CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the General Conditions which are fully <br />incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br />orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br />Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br />the Contract Documents shall be interpreted in the following order of priority: <br />a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br />b. Designer approved and stamped construction documents and drawings and written <br />specifications. <br />c. Designer approved communications and field orders. <br />d. Request for Proposals and addenda thereto. <br />e. Proposal. <br />2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br />for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br />to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br />a. Construction Drawings prepared by Smith Sinnett Architecture (Sheet Whitted Building <br />Improvements G0-01, G0-02, A0-01, A0-02, A1-01, A2-01, A2-02, A2-03, A2-04, A6-10, A6- <br />11, A6-12, Piedmont Food Processing Center Window Replacement G0-01, G0-02, A1-01, <br />Cedar Grove Community Center Flooring Replacement G0-01, G0-02, A0-01, A0-02, A1-01 <br />dated September 16, 2024, and Addendum 01 dated 10/07/2024, Addendum 02 dated <br />10/08/2024 and Addendum 03 dated 10/17/2024) <br />Docusign Envelope ID: 52FACC74-DA96-491B-B0B8-04AC3961737D