Orange County NC Website
[Departmental Use Only] <br /> TITLE Architectural Projects <br /> FY 2024=2025 RFP5436 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER $250 ,000 . 00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement") , made as of the 22nd day <br /> of January, 2025 , by and between Harrod and Assoc . Constructors , Inc, (hereinafter called the " Contractor") , <br /> and Orange County , a political subdivision of the State of North Carolina, (hereinafter called the " County , " <br /> " Orange County," or " Owner") , <br /> WITNESSETH . <br /> That the Contractor and the Owner, for the consideration herein named , agree as follows : <br /> 1 . CONTRACT DOCUMENTS ; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br /> orders, the Proposal , Construction Documents and Drawings and Written Specifications . The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority : <br /> a . This Agreement and incorporated General Conditions attached as Exhibit 1 . <br /> b . Designer approved and stamped construction documents and drawings and written <br /> specifications . <br /> c . Designer approved communications and field orders . <br /> d . Request for Proposals and addenda thereto . <br /> e . Proposal . <br /> 2 . SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials , and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written NoticeAo -Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents , <br /> which are made a part hereof as if fully contained herein : <br /> a. Construction Drawings prepared by Smith Sinnett Architecture ( Sheet Whiffed Building <br /> Improvements GO - 01 , GO -02 , AO - 01 , AO -02 , AI - 01 , A2 - 01 , A2- 02 , A2- 03 , A2- 04 , A6 - 10 , A6 - <br /> 11 , A6 - 12 , Piedmont Food Processing Center Window Replacement GO - 01 , GO- 02 , Al - 01 , <br /> Cedar Grove Community Center Flooring Replacement GO - 01 , GO - 02 , AO - 015 AO - 025 A1 - 01 <br /> dated September 16 , 2024) <br /> b . Written specifications prepared by the Designer . <br /> Revised 01 / 24 1 <br />