Orange County NC Website
88 <br /> C. Will the project involve a land application system for treatment of wastewater? <br /> ■ x❑ Yes ❑ No - If yes, describe <br /> Please see Attachment B <br /> ■ Has an application for a non-discharge permit been submitted to the NC <br /> Department of Environmental Management or Orange County Department of <br /> Environmental Health?,❑ Yes1X NO APPLICATION HAS BEEN SUBMITTED <br /> 1D. Is a septic tank system proposed which has a design capacity of more than <br /> 3,000 gallons per day? <br /> x❑ Yes ❑ No - If yes, describe <br /> Please see Attachment B <br /> E. Does the activity involve sludge disposal? ❑ Yes x❑ No <br /> ■ If yes, where is the source of the sludge? <br /> • Describe where and how the sludge is being disposed <br /> ■ Has a NPDES permit from the NC Division of Environmental Quality been issued? <br /> ❑ Yes ❑ No <br /> F. Water Usage <br /> • Estimated number of employees: x 25 gallons per day (gpd) = gpd <br /> • Estimated water use for climate control - gpd <br /> ■ Process Water <br /> % Consumed <br /> % Discharged to septic system <br /> % Discharged to surface (including storm sewers - Describe: <br /> % Evaporated <br /> % Reclaimed/reused <br /> % Other <br /> = 100% <br /> ■ Water used for cooling, heating, etc., in association with production or manufacturing <br /> % Reused <br /> % Consumed <br /> % Discharged - Describe: <br /> = 100% <br /> gpd Total Water Usage <br /> ■ Describe r f water: <br /> Please see Attachment B <br /> Page 4 of 5 <br />