Browse
Search
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 02-04-2025 Business Meeting
>
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 1:32:28 PM
Creation date
1/30/2025 1:34:01 PM
Metadata
Fields
Template:
BOCC
Date
2/4/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for February 4, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 02-04-2025 Business Meeting
Minutes 02-04-2025-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2025
ORD-2025-005-An Ordinance Amending the UDO of Orange County
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-005-Acceptance of the Agricultural Growth Zone Grant with the North Carolina Department of Agriculture
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-006-CHCCS & OCS Schools Adequate Public Facilities Ordinance Approval of Membership and Capacity Numbers
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-007-OCS-SAPFO- Schools Adequate Public Facilities Ordinance -Approval of Membership and Capacity Numbers
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-015-Statement of Consistency of a Proposed UDO Text Amendment with Adopted Orange County Plans
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-016-Statement of Inconsistency of a Proposed Zoning Atlas Map Amendment with the Adopted Orange County 2030 Comprehensive Plan and Other ApplicableAdopted Plans
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-001-Black History Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-010-Motor Vehicle Property Tax Release Refund
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-011-Late Applications for Property Tax Exemption Exclusion
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
59 <br /> r Tiddlef.ead <br /> =r Corner <br /> Fiddlehead Corner -Traffic Impact Assessment <br /> Ramey Kemp Associates, a Traffic & Transportation Engineering Firm with many years of <br /> experience in the RTP was commissioned by Hands Four Development Cooperative (H4D) to <br /> provide a Traffic Impact Assessment for the proposed Fiddlehead Corner development. [PIN # <br /> 9739-72-0339] <br /> The TIA parameters were developed in consultation with Orange County staff and NCDOT staff. <br /> The TIA examined the proposed development at full buildout of 150 dwelling units and all <br /> support activities. In addition, a first phase of development consisting of 49 dwelling units plus a <br /> community building, plus one eldercare facility [6 residents] and support infrastructure was <br /> studied. <br /> The TIA was "conservative" as requested by NCDOT and Orange County. Conservative <br /> applying in several ways to the analysis. <br /> • Trip Generation Rates: The Fiddlehead Corner community will have primarily one and two- <br /> bedroom residences and be home to smaller families; nevertheless, the ITE codes for larger <br /> single-family homes and households with adults going off-site for work and children <br /> attending school were utilized for traffic generation calculations. <br /> • Important Street Intersections: In the TIA, all traffic from Fiddlehead Corner development <br /> was routed through the proposed development entrance road intersection a Morrow Mill. Of <br /> that total, 95% of the traffic is expected to go east toward NC54. This process provided the <br /> heaviest traffic flow projections from Fiddlehead on Morrow Mill Road and at the intersection <br /> of Morrow Mill with NC54. <br /> • Emergency Services Requirements: Once Fiddlehead Corner reaches 100 dwelling units a <br /> second access is required. That connection will be at Fiddlehead Drive and Gold Mine Loop <br /> Road. Additionally, that entrance will provide access to three-four homes in POD 131, the <br /> Cheek property. <br /> The Ramey Kemp TIA, using NCDOT methodology shows that roadway improvements are not <br /> warranted at the NC54 - Morrow Mill Road intersection or at the Fiddlehead Corner primary <br /> entrance to Morrow Mill Road for the first phase. Improvements to these intersections are <br /> warranted at full buildout. <br /> We agree with these conclusions, particularly because we believe that traffic generated by our <br /> households will be measurably less in the AM Peak than the ITE use code for low rise <br /> multi-family dwelling units. <br /> The TIA by Ramey Kemp was submitted to both Orange County and NCDOT for review. <br /> Included in our MPD-CD application are comments from Nishith Trivedi, Transportation Director <br /> TIA Statement 2023.12.29.docx Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.