Orange County NC Website
43 <br /> KEY <br /> A-COMMUNITY CENTER <br /> B-FITNESS CENTER <br /> C-FAMILY CARE HOMES#1 AND#2 e - <br /> D-MULTI-FAMILY BUILDING(20 UNITS,3 STORY AND 30 a 22 ---- <br /> PARKS/BUILDING) <br /> E-FRONT LOADED DETACHED HOMES(2 PARKS ON <br /> EACH LOT) <br /> F-REAR LOADED COTTAGES(2 PARKS ON EACH LOT) <br /> G-REAR LOADED DUPLEX AND TRIPLEX(2 PARKS ON _ <br /> EACH LOT) <br /> H-SMALL REAR LOADED DUPLEX AND TRIPLEX(2 <br /> PARKS PER DWELLING ADJACENT IN STREET) <br /> J-SMALL DUPLEX AT WALK-OUT CONDITION(2 PARKS <br /> PER DWELLING ADJACENT IN STREET) <br /> K-EXISTING HOME SITE <br /> L-APPROXIMATE LOCATIONS OF FUTURE HOME SITES <br /> M-EXISTING VINEYARD <br /> 1-COMMUNITY COMMONS ;p <br /> 2-ENTRY LANDSCAPE FEATURE <br /> 3-CAR AND CART DROPOFF 'E <br /> 4-GUEST AND RESIDENT PARKING <br /> 5-NEIGHBORHOOD COMMONS <br /> 6-EMERGENCY VEHICLE CONNECTION <br /> 7-RESIDENT PARKING '' I 2•' <br /> r <br /> 8-COMMUNITY TREE HOUSE r I f <br /> 9-PAVILION AT MEADOW , <br /> 10-PICKLEBALL COURTS <br /> 11-COMMUNITY GARDENS,GARDENING AND <br /> MAINTENANCE BUILDINGS <br /> 12-MANICURED PRESERVE I <br /> 13-WELL SITE#1 �I <br /> 14-WELL SITE#2 L <br /> 15-STORMWATER CONTROL MEASURES <br /> 16-STREAM BUFFER(TYP) -,✓ <br /> 17-WOOD SHOP AND WASTE WATER TREATMENT <br /> I <br /> 18-RECYCLING CENTER AND RV STORAGE <br /> 19-PRIMARY DRIP AREA <br /> 20-CONNECTION TO GOLD MINE LOOP L - -� <br /> 21-100'NATURAL BUFFER <br /> 22-75'NATURAL BUFFER(EAST AND NORTH <br /> BOUNDARY) <br /> 23-PRIMARY ENTRY FROM MORROW MILL ROAD <br /> 24-PERVIOUS PATHS AND PEDESTRIAN BRIDGE <br /> 25-REPAIR DRIP WASTEWATER AREAS <br /> ,.0 MMUNITY CENTER,PART A OF ELDER <br /> CARE,ONE 20 UNITS STACKED FLAT BUILDING,30 <br /> TOWNS AND DETACHED UNITS.TOTAL+1-50 HOMES. <br /> WELL#1 AND 33%WASTE WATER FACILITY. •� <br /> MEADOW,COMMUNITY GARDENS,GARDEN <br /> AND MAINTENANCE BUILDINGS.35 TOWNS AND 0 <br /> DETACHED UNITS AND ONE 20 UNIT STACKED FLAT �• K L <br /> BUILDING.TOTAL-1-55 HOMES.LARGE SWC,WELL#2, <br /> AND SECOND 33%OF WASTE WATER FACILITY. `• • 0 ----. <br /> COMPLETELOOP ROAD. } <br /> I <br /> FITNESS CENTER,25 TOWNS AND DETACHED S <br /> UNITS PLUS ONE 20 UNIT STACKED FLAT BUILDING.45 <br /> TOTAL HOMES.COMPLETE STORMWATER FACILITY. <br /> FIDDLEHEAD CORNER 3.19.2024 <br /> nAakw. Illustrative Master Plan Concept - Phasing Plan MR te* <br /> for the Hands Four Development Cooperative SCALE:0 10011 cOh0=100Feet400 <br /> NORTH <br />