Browse
Search
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 02-04-2025 Business Meeting
>
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 1:32:28 PM
Creation date
1/30/2025 1:34:01 PM
Metadata
Fields
Template:
BOCC
Date
2/4/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for February 4, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 02-04-2025 Business Meeting
Minutes 02-04-2025-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2025
ORD-2025-005-An Ordinance Amending the UDO of Orange County
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-005-Acceptance of the Agricultural Growth Zone Grant with the North Carolina Department of Agriculture
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-006-CHCCS & OCS Schools Adequate Public Facilities Ordinance Approval of Membership and Capacity Numbers
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-007-OCS-SAPFO- Schools Adequate Public Facilities Ordinance -Approval of Membership and Capacity Numbers
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-015-Statement of Consistency of a Proposed UDO Text Amendment with Adopted Orange County Plans
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-016-Statement of Inconsistency of a Proposed Zoning Atlas Map Amendment with the Adopted Orange County 2030 Comprehensive Plan and Other ApplicableAdopted Plans
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-001-Black History Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-010-Motor Vehicle Property Tax Release Refund
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-011-Late Applications for Property Tax Exemption Exclusion
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 <br /> Fiddlehead Corner MPD-CD I Proposed Development Conditions <br /> December 17,2024 <br /> Page 5 of 5 <br /> 11 Fiddlehead Corner shall comply with the 24% Maximum Impervious Surface <br /> Requirement of the Haw Protected Watershed in effect at the time of the Orange <br /> County BOCC zoning approval. <br /> • The Orange County UDO does not contain impervious surface maximum requirements <br /> for that watershed and has limited stormwater quality discharge standards. <br /> • The submitted Fiddlehead Corner Master Plan has an 18±% calculated impervious <br /> surface. <br /> J] Stormwater Management <br /> Fiddlehead Corner shall comply with the UDO Stormwater Management requirements of the <br /> Haw River Protected Watershed in effect at the time of the Orange County BOCC zoning <br /> approval. <br /> K] Wastewater Treatment System <br /> The design and installation of the Wastewater collection, treatment & subsurface distribution <br /> system shall be approved by the NC DEQ pursuant to NC Standards & Requirements. <br /> H4D will contract with a "System Operator" Licensed in the State of NC to operate & <br /> maintain the wastewater collection, treatment and sub-surface distribution <br /> L] Wells &Water Treatment System <br /> Wells shall be approved by the NC DEQ pursuant to NC Standards & Requirements. <br /> Two (2) wells are required before occupancy permits are issued by Orange County for more <br /> than 49 dwelling units. <br /> H4D will contract with a "System Operator" Licensed in the State of NC to operate & <br /> maintain the water collection, treatment and distribution system. <br /> ZAA Dev Conditions Statement 2024-12-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.